An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Band 2 Design Study Kickoff Meeting • Goals of this meeting • Finish in one hour • Everyone upon leaving knows their role and responsibility and how it fits in with overall band 2 design study • Everyone knows what they’re doing for band 2 in the next 6-8 weeks • Goal of band 2 design study • Proposal to ALMA Board for FY14 start of pre-production band 2 with expanded science case and revised specifications 10 September 2014

  2. People • Project Manager: Eric Bryerton • Project Scientist: David Frayer • System Engineering : Kamaljeet Saini • Science: David Frayer, Tony Remijan, Scott Schnee, Lucy Ziurys • Optics: Sri Srikanth • MMIC LNA: Eric Bryerton / Matt Morgan • Hybrid LNA: Marian Pospieszalski • Downconverter: Matt Morgan • High Image-Rejection Option: Kamaljeet Saini • Arizona Radio Observatory: Prof. Lucy Ziurys, Gene Lauria, Bob Freund, George Reiland • ALMA NA Development Program Manager: Bill Randolph 10 September 2014

  3. ALMA Development Funding • ALMA Development funding profile for North America (includes design studies, hardware and software upgrades, etc.) • FY12: $1.21M • FY13: $2.16M • FY14: $3.81M • FY15+: $5.54M / year • Current Development Projects • Band 5 (Europe to build cold cartridges, NA to build LOs) • NA to spend $1.67M in FY13 and $1.58M in FY14 • EU to spend ~$16M on cold cartridges, i.e. most of their development money through 2017 • VLBI (Event Horizon Telescope) • East Asia (NAOJ) leading consortium to develop proposal for full production of band 1, with some components (LNAs, OMTs, etc.) from NA • A NA development funding wedge begins to open up in FY14 • Also need to renew UVML SIS funding • Goal is to be ready to write proposal to ADSC and ALMA Board for Band 2 pre-production start in FY14 10 September 2014

  4. Band 2 Proposal: Reviewer Comments • All positive • Second-highest ranked proposal (out of 21). Ranked ahead of band 1  • Strong science case, band 2 science workshop good idea 10 September 2014

  5. Band 2 Frequency Range • Band 3 is 84-116 GHz • Current Band 2 Spec is 67-90 GHz 10 September 2014

  6. Band 2 Gain/Noise Budget Table 2: Preliminary gain and noise budget for the ALMA band 2 receiver. • Current ALMA Band 2 Noise Specification: 30 K SSB over 80% of the RF band and 47 K SSB at any RF frequency in the band, where the RF band is defined as 67-90 GHz. • To meet this spec would require a cold lens and a LNA with 20K noise temperature • Also investigate tradeoff of extending upper band edge to 93.2 GHz (simultaneous observations of [N2D+]/[N2H+] line pair) 10 September 2014

  7. Overview of Deliverables • We propose to host an ALMA Band 2 Science Workshop to prepare a complete band 2 science case, including a proposed set of key programs for the first 100 hours of Band 2 observing, to drive a set of observational requirements and realistic technical specifications for the band 2 cartridge production. • AI: Prepare one-page preliminary plan for workshop (date, location, attendees, agenda) [Dave Frayer: 31-July-2012] 10 September 2014

  8. Overview of Deliverables • We propose to deliver an optics report containing drawings and simulations of the entire band 2 optics, including expected contributions to receiver noise. We will fabricate and test a band 2 turnstile-junction OMT and feed horn. We will investigate the option of a 15 K lens to reduce the receiver noise. • AI: Prepare drawings and model for OMT [Sri Srikanth: 31-July-2012] 10 September 2014

  9. Ku-Band (11-18 GHz) OMT For GBT Pulsar wide band receiver Square waveguide 0.610” x 0.610”; Rectangular waveguide 0.610” x 0.305” Turnstile junction design for 2:1 aspect ratio waveguide Stepped transition height 0.305” —› 0.133” Wall thickness between waveguides = 0.039” E-plane combiner- 2 steps; 0.286”, 0.295”, 0.305” External dimensions 5.975”x4.340” Fits in a circle of 6.250” diameter Prototype for ALMA Band 1 and Band 2 OMT 10 September 2014 9

  10. Ku- Band (11-18 GHz) OMT (Microwave Studio Simulations) 10 September 2014

  11. Overview of Deliverables “In this design study, we will continue to package and characterize already-designed 35nm MMIC amplifiers over the ALMA band 2 frequency range. We will also build and test a band 2 cryogenic hybrid LNA using 80 nm CRYO3 InP HEMTs.” • AI: Build and test CRYO3 LNA [Marian Pospieszalski: 31-Aug-2012] • AI: Test APRA2 InGaAs MMICs [Eric Bryerton: 31-July-2012] 10 September 2014

  12. Cryogenic 35nm MMIC LNAs 10 September 2014

  13. Overview of Deliverables “We propose to prototype and test a warm downconverter module (in a LO driver PA form factor) using commercial off-the-shelf MMICs. This module will have two 4-12 GHz IF outputs to interface to the warm IF plate.” • Prototype downconverter module in PA form factor probably beyond design study, sufficient to test COTS MMIC as 2SB mixer? • AI: Procure Hittite HMC-MDB277 mixer MMICs [Matt Morgan: 31-July-2012] 10 September 2014

  14. Band 2 Block Diagram 10 September 2014

  15. Overview of Deliverables “We propose to investigate the option of a high image-rejection downconverter/LO option, clarifying the scientific benefit and estimating the total cost of implementation.” • Requires laser synthesizer to deliver two references on same fiber simultaneously (one ~76-85 GHz and one ~24 GHz fixed) • Part of unfunded photonics upgrade study • AI: Report on current feasibility of high IR option [Kamaljeet Saini, 31-July-2012] 10 September 2014

  16. Overview of Deliverables “We propose to integrate and compare observationally the cryogenic LNA options of an ALMA band 2 receiver on the ARO 12m telescope.” • Does revised schedule make sense? • Actions for next 6-8 weeks? • AI for PM is to get ARO the subaward 10 September 2014