An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Selection Techniques for selecting projects

  2. Learning Objectives • Understand basic evaluation models for selecting projects • Understand various techniques and approaches to evaluating potential projects • Understand the utility of computer tools in project selection • Be able to evaluate your organization’s techniques and suggest improvements

  3. Why is Project Selection Important? • The FIRST STEP in successful projects • Wasted resources with starts and stops, high-risk, high-cost projects • Lost opportunity costs of not doing the “right” projects • Completion of projects that do not contribute to the organization’s strategic direction (throw-aways)

  4. Overview of PS Issues • Project Management Office (PMO): What role should it play? How can it help? • Project Proposals: How is the list of potential projects built? • Strategically selecting best Projects: What global criteria should be used? • Project Selection: What local, individual criteria are important • Dealing with Uncertainty: How important is risk analysis at this stage?

  5. Project Management Office What role should it play?

  6. Potential Roles for the PMO • Define proposal formats and requirements • Collect proposals • Do preliminary screening based on criteria (local and global) • Convene Strategic Board (Decision makers) • Recommend and provide details to decision making board • Follow-up on getting project approved, funded, organized, and initiated.

  7. Project Proposals How to document a potential project

  8. Project Proposal:Content • Executive summary • Statement of need and business benefits of project • Nature of problem to be solved and general approach to a solution • Approach for implementation and support for the project • Description and experience of potential project team

  9. Project Proposal:Statement of need and Business Benefit • Description of the need in general terms (non-technical) • Why it is a need now – urgency • Business Benefits • Tangibles and intangibles

  10. Project Proposal:Technical Approach • More detailed description of problem to be addressed or project to be undertaken • Major subsystems of problem or project • Methodology or approach of solving the problem • Possibly alternative analysis • Special client requirements

  11. Project Proposal:Implementation and support approach • Rough Order of Magnitude of effort and cost • Impacts on equipment, facilities, staff • In-house resource capability versus out-sourcing potentiality • Termination success statement • Potential logistic support needed • Other “success” needs

  12. Project Proposal:In-house staff and skills requirement • Key project staff required • Estimate of skills required • Availability of required project staff • Impacts on organization departments and personnel

  13. Project Selection Models Global and Local Criteria

  14. Models – Benefits • Real world problems are much too complex to analyze in their entirety • A Model is an attempt to identify and isolate the “essential” elements of the real world problem in order to simplify enough for analysis • Models can provide valuable “insight” into the elements of a problem

  15. Types of Models • Numeric versus Non-numeric • Stochastic versus Deterministic • Analytical versus Descriptive • Diagrammatic versus Textual • Complex, multifaceted versus Simple, single dimension

  16. Characteristics of “Good” Model • Realistic – Should include all “important” variables of the real problem • Capable – Should be able to integrate the variables into the algorithm • Flexible – Should handle various combinations of variables, including new ones • Easy to use – Should be intuitive, not requiring a long or steep learning curve • Computerized – To alleviate the workload of using it

  17. Non-numeric Selection Models • Sacred Cow (The boss wants it) • Mandatory due to operations • Mandatory due to competition • Mandatory due to legislation (legal) • Extension of existing activities, projects, products, or processes • Comparative Benefits (Opinion based) • Discussion • Delphi • Q-Sort

  18. Q-Sort

  19. Numeric PS Models:Profit / Profitability • Payback Period (PB) • Average Rate of Return • Discounted Cash Flow (NPV) • Internal Rate of Return • Profitability Index

  20. Unweighted 0-1 Factor Model Unweighted Factor Scoring Model Weighted Factor Scoring Model Constrained Weighted Factor Scoring Model S = ∑(x), x=0,1 S = ∑(s), s=score S = ∑(s·w), w=weight S = ∑(s·w) ∏(c), c=constraint Numeric PS Models:Scoring

  21. Benefits of Scoring Models • Structurally simple • Multiple decision criteria • Easy to modify • Easy to do “what if” or sensitivity analysis • Weights provide flexibility

  22. Drawbacks of Scoring Models • It is a “ranking” method, but does NOT necessarily represent “true” value • Quantitative value may cause decisions without “judgment” • Assigning values sometimes is haphazard • Input value changes (assumptions) may cause large swings in results

  23. Choosing the PS Model • Firms with outside funding often chose scoring PS models • Firms without outside funding often chose profit / profitability PS models • 80% of Fortune 500 firms also use “nonnumeric” PS models

  24. Risk Analysis with Crystal Ball

  25. Including Risk Analysis – Stochastic Models • Instead of assigning a fixed value to a raw score, assign a range of values and a probability. • Probability is usually more “realistic” • It may also be more “correct”

  26. Areas of Uncertainty • Project timing & expected cash flow. • Direct outcome of project, i.e. what exactly will the project accomplish • Side effects and unforeseen consequences of project

  27. Introduction to Monte Carlo Technique • Outputs are a result of an algorithmic combination of inputs • if the inputs cannot be determined with confidence, then provide a probability range • Monte Carlo Simulation picks an input value, based on the probability function, for each variable and calculates the result from the algorithm • This is done numerous times (500 or 1000) and the results are plotted

  28. Crystal Ball • A Monte Carlo Tool that plugs into Excel • Any formula or calculation that can be done in Excel can be modified to use probabilities and Monte Carlo Simulation

  29. Probability Distributions for Inputs

  30. Risk Analysis: Output

  31. Self Assessment • What are some of the roles of the PMO in project selection? • What should be included in a project proposal? • How does a Q-Sort work? • How does a Scoring Model work? • What is a Monte Carlo technique? • What is Crystal Ball? How does it work?