Surveillance in Europe: status and plans

Surveillance in Europe: status and plans. MAKS 2013, Moscow 29 th August 2013. Johan Martensson Network Manager Directorate, EUROCONTROL. Agenda. ADS-B/WAM Deployment – CASCADE . Ground Surveillance Applications (ADS-B Out). 2010 IOC. Enhanced ATS in Non-Radar areas (NRA)

parson
Télécharger la présentation

Surveillance in Europe: status and plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Surveillance in Europe:status and plans MAKS 2013, Moscow 29th August 2013 Johan Martensson Network Manager Directorate, EUROCONTROL

  2. Agenda

  3. ADS-B/WAM Deployment – CASCADE • Ground Surveillance Applications (ADS-B Out) 2010 IOC • Enhanced ATS in Non-Radar areas (NRA) • Enhanced ATS in Radar areas (RAD) • Airport Surface Surveillance (APT) • Aircraft derived data (ADD) ADS-B Receiver • Wide Area Multilateration (WAM) • Interval Management (FIM - ADS-B In Spacing) • Airborne Surveillance Applications (ADS-B In ATSAW) • Enhanced TSA during Flight operations (AIRB) • In Trail Procedure (ITP) • Visual separation on approach (VSA) • Enhanced TSA for Surface operations (SURF) 2011 IOC ATS – Air Traffic Services TSA – Traffic Situation Awareness

  4. Global interoperability • More than a decade of intensive international co-operation • ANSPs/Airspace Users/Industry/Regulators • Common Standards for Operations and Systems • Completed for • ADS-B Out • ADS-B In: Traffic Situation Awareness in the cockpit • Ongoing for • ADS-B In: Spacing, Separation, Alerting • Aligned Certification material • Civil-Military interoperability • Reduction of exemptions for State aircraft • Provisions for military in SES Regulations • Rationalisation of CNS infrastructure • Exchange of functional performance assessment results • Guidance to implementers • Great contribution to global interoperability and cost-efficiency

  5. Agenda

  6. EU Regulation 1207/2011 ADS-B OUT Mandate Phase Pioneer Phase Voluntary implementation in pocket areas Certified existing equipage IR based implementationin wider areas Upgraded equipage 2015 2017 2019 Avionics: EASA AMC20-24 Avionics: EASA CS-ACNS Forward-fit Retro-fit State a/c ADS-B IN Pioneer Phase Voluntary implementation in wider areas New equipage Avionics: EASA AMC20-24 and later EASA CS-ACNS ADS-B and WAM Deployment in Europe WAM WAM / ADS-B Ground system Deployment

  7. ADS-B Out and Mode S Mandate • Mandate dates • Forward fit 8 Jan 2015 • Retrofit 7 Dec 2017 • Provisions for State a/c (Article 8) • 7 Dec 2017 (Mode S ELS) • 1 Jan 2019 (Mode S EHS and ADS-B for transport-type aircraft) Regulation (EU) 1207/2011 European Commission Single European Sky Surveillance Performance & Interoperability Implementing Rule (SPI IR) • All aircraft flying IFR/GAT • Mode S ELS • Aircraft flying IFR/GAT >5700 kg or >250kts TAS • ADS-B Out & Mode S EHS • Option for ADS-B specific airspace mandate 7

  8. Mode S radar Deployment • 322 Mode S radars • 12 new applications (not included)

  9. ADS-B & WAM Deployment 9

  10. Estimated ADS-B & WAM sensors & systems 10

  11. Aircraft readiness for ADS-B Out operations Two certification baselines: AMC 20-24 Legacy ADS-B Out installations are generally compliant to AMC20-24 Several configurations are Certified Currently used in Operations Short term implementation in lower density airspace CS-ACNS – compliance means for EU Regulation 1207/2011 Avionics upgrade required (currently limited availability) Support high density surveillance Recommended (future) implementation baseline

  12. EU IR 1207/2011 (CS-ACNS)Key ADS-B Avionics Requirements • System Integrity: 10-5/fh • System Continuity: 5000fh MTBF* • Stringent Latency requirements • Additional GPS receiver qualification required (beyond ETSO level) • Same data sources as for SSR • Device & function failure indications • Air/ground status determination • Geo Alt: only height-above-ellipsoid • Antenna diversity, transmit power – same as for Mode S • * CS-ACNS NPA suggesting “remote” discussion on-going Total Latency: < 1.5s Uncomp. Latency: < 0.6s

  13. ADS-B Out Regulations in Europe and USAHigh-level comparison Europe 1207/2011(Draft CS-ACNS) ≈ US 14 CFR 91.227(AC20-165A)

  14. ADS-B IN 5000+ ATSAW flights • First ATSAW certified aircraft delivered June 2011 • First ATSAW Operations by Swiss 7 Feb 2012 • 5000+ flights performed so far Pioneer operators • Other operators are ordering ADS-B In for new a/c 14

  15. Agenda

  16. Surveillance Evolution & Consequences • Surveillance functions are moving to the aircraft • Cooperative surveillance: Mode A/C >> Mode S >> ADS-B • More information is provided by the airborne sub-system • Surveillance performance is more dependent on the airborne sub-system • Airborne surveillance sub-system is becoming more complex • More functions • Increasing number of interfaces with avionics  Increasing need for air-ground & air-air interoperability  Increasing need for inter-avionics equipment interoperability

  17. Performance Monitoring 13300 ADS-B aircraft in the Database 19 billion ADS-B reports Continuous monitoring International co-ordination

  18. Agenda

  19. Ground SurveillanceTechnical specifications • Composite ADS-B and WAM surveillance system specification • Surveillance services from a single equipment network architecture • New system specification for combined systems (ED-nnn) • Updated ADS-B & WAM system specifications (ED-129 & ED-142) • Generic Surveillance (GEN-SUR) - SPR & PSC • Guidance to address safety requirements in EC Regulation 1207/2011 – Safety assessment for all Surveillance systems • Combining surveillance techniques (ADS-B, Radar, WAM) at functional a level

  20. Ground SurveillanceSatellite based ADS-B • Global coverage of ADS-B Out • excluding higher density areas • Several studies • One consortium (Aireon) with firm deployment plans • Objective to support 15-15 NM Separation • 66 LEO satellites (Iridium NEXT) • First launch 2015 / Full constellation 2017 • ATM Impact – key areas • Network Improvement • Business Case • Interoperability • Global coordination will be required

  21. ADS-B Out expansion beyond Air Transport • Proposal to increase the scope of EU Regulation 1207/2011 • No change to existing requirements or dates ! • Objective to cover all aircraft subject to surveillance • Maximise Surveillance infrastructure rationalisation • Mitigate airspace infringements and prevent misleading data • Low cost ADS-B Out [GNSS & Transponder] • Two initiatives: • LPSE – Low Power Surveillance Equipment (FAA) • LPAT – Low Power ADS-B Transceiver (UK) • Voluntary equipage • Target low end airspace users, visible for Situation Awareness but not for ATC separation services • Mitigate airspace infringements and prevent misleading data

  22. ABS-B IN Next steps • Flight Deck Interval Management (FIM) • Speed guidance to achieve precise interval spacing between aircraft • Step 1: MOPS & SPR target end 2014 • Step 2: tbd • Traffic Situation Awareness with Alerts (TSAA) • ADS-B based collision avoidance system for aircraft without ACAS II • At the “traffic advisory” level, i.e. no coordination or resolution advisories • MOPS & SPR target end 2013 • CDTI Assisted Visual Separation on Approach (CAVS) • After initial visual contact - allow Own Visual Separation where the Display replaces visual contact • MOPS & SPR target end 2013

  23. Other Surveillance related Developments • Flight plan indications for ADS-B • Proposal to introduce means to indicate specific ADS-B Out and ADS-B In capabilities in the ICAO flight plan • FPL 2012 indications as baseline • Expanding through the SUR/ indicator in Item 18 • ACAS improvements • Hybrid ACAS – reduced RF though passive use of ADS-B • ACAS X – Improved ACAS, backwards compatible, with application adjusted logic • Improved data link for Surveillance • 1090 MHz increased bandwidth through phase modulation • Future data link studies

  24. Conclusions Surveillance standards and Regulationspublished Airborne & Ground Deploymentongoing RationalisedHigh PerformanceSurveillancesystem New Application Developmentongoing Global Interoperability

  25. Questions

  26. SES Surveillance Regulations overview Airborne Surveillance – ADS-B In Voluntary benefit driven implementation Airborne Safety net – ACAS II v7.1 – IR driven EC IR 1332/2011 ICAO Forward-fit v7.1 EUR Forward-fit v7.1 EUR Retro-fit v7.1 Air / Ground Interface – Mode S & ADS-B Out – IR driven Aircraft operators Service providers Forward-fitELS / EHS / ADS-B Mil.Trp.a/c EHS / ADS-B Retro-fitELS / EHS / ADS-B Mil. a/c ELS EC IR 1207/2011 NPA 2012-19 -> CS-ACNS Systems ready for Aircraft ID as identification means EC IR 1206/2011 Ground Surveillance – ADS-B Out / Mode S / WAM Most appropriate & efficient surveillance solution for the particular environment

  27. SES Surveillance Regulations Applicability • EU IR 1207/2011 – Mode S & ADS-B Out (v2) • All IFR/GAT aircraft • Mode S ELS • IFR/GAT aircraft >5700kg or >250kts TAS • ADS-B Out • Fixed wing IFR/GAT aircraft >5700kg or >250kts TAS • Mode S EHS • ANSPs • Most efficient solution • Possibility for local mandates • EU IR 1332/2011 – ACAS II v7.1 • Turbine-powered aeroplanes > 5 700 kg or > 19 passengers • ACAS II v7.1 • Also applies to aircraft which will be equipped on a voluntary basis • Does not apply to unmanned aircraft systems Timeline ADS-B/ELS/EHS Rtr + ELS Mil. a/c7 dec 2017 ADS-B/ELS/EHS Fwd 8 Jan 2015 ADS-B/EHS Mil. Trp. a/c1 Jan 2019 Regional Mode S mandates TCAS v7.1 Fwd1 Mar 2012 TCAS v7.1 Rtr1 Dec 2015 Ground systems ACID ready 2 Jan 2020 (EU IR 1206/2011)

  28. ICAO Documents SASP - Separation and Airspace Safety Panel ASTAF - Airborne Surveillance Task Force • ADS-B Out • Annex 10 Volume IV (Current Amdt 85, next version: v2 ES 1207/2011) • Mode S Services on ES (Doc 9871 ed2, 2012) • ADS-B In [AIRB, ITP, SURF, VSA] + [IM, CAVS, CAPP, TSAA] +… • PANS-OPS (Doc 8168) to include A/C Operating Procedures • Airborne Surveillance Manual (Draft Doc 9994, ASTAF) • ITP (SASP and ASTAF) • PANS-ATM (Doc 4444) ITP Circular (Draft) • Mode S & ACAS II • Annex 10 Volume III & IV • Mode S Services on ES (Doc 9871 ed2, 2012) • ACAS Manual (Doc 9863 ed2, 2012)

  29. Regional Regulatory Documents • Equipment certification: • ADS-B Out ETSO-C166b (Jul 2012)* + ETSO-C129a / ETSO-C145c/146c / ETSO-196a • ADS-B In ETSO-C195a (Jul 2012), TCAS hybrid sur. ETSO-C119c (Dec 2009) • ACAS II ETSO-C119c (Dec 2009) • Mode S ETSO-C112d (to be issued) • Airworthiness Approval • ADS-B Out: CS-ACNS (NPA 2012-19, expected Q2 2013)(AC20-165A (Nov 2012)) • ADS-B In: CRI (Certification Review Item), Tbd EASA Certification Memo(AC20-172A (Mar 2012)) • Mode S & CS-ACNS (NPA 2012-19, expected Q2 2013), JAA TGL13 Rev1 (June 2003),ACAS II AMC20-13 (Dec 2006)(AC20-131A, AC20-151A)

  30. ADS-B Out Required Data items

  31. Mode S Required Data items

  32. Typical ADS-B/WAM Benefit casesNon-Radar Airspace • TMA around secondary airports with increasing traffic (e.g. low-cost carriers) • No Surveillance coverage • Reduced efficiency (sub-optimal routing, holdings etc.) -> estimate 2-3 mins per a/c -> enabling of PBN (Kos/Greece as a pilot case) • If there are predominant carriers, current ADS-B technology could be used • If there is mixed fleet, WAM could be an alternative (typically higher cost than ADS-B as it includes multiple stations but still lower than radar)

  33. Typical ADS-B/WAM Benefit casesRadar Airspace • Future Radar decommissioning • Cost avoidance (ADS-B/WAM cost is significantly lower) • Assessed with UK NATS (Mode S radar replacement) • WAM can be used now • ADS-B requires the SPI IR functionality (dates 2015-2017) • Clause for ANSP efficiency • IR 1207/2011 extension? • Incentives (e.g. low-end)?

  34. ACAS X

  35. EC Implementing Rule Exemptions and Incentives Regulation (EU) 1207/2011 European Commission Single European Sky Surveillance Performance & Interoperability Implementing Rule (SPI IR) Exemption provisions: • Mode S EHS only (specific architectures) Basic Regulation (EU) 216/2008 • Generic exemption provisions: • Article 14 para 4 and 5 • INCENTIVES: • At this stage not anticipated for AOC holders 35