An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building Action Plan <<Company>> Month Year

  2. Table of Contents • Audience, Purpose, Scope • Sustainability Team • Building Specific Findings • Measure Selection • Project Plan Timing • Sustainability Scorecard • Appendix • Measures

  3. Audience – Scope - Purpose • Audience: Building Team and Asset Manager • Scope: Outline the sustainability improvements that will be implemented throughout the building • Purpose: To explain the selection methodology, timeline and specific improvement measures

  4. Background • In September 2012 we made the commitment to focus on improving our sustainability • During September and October we assessed our current performance and identified a prioritized opportunity list • During November we worked through the funding process

  5. Building Sustainability Team

  6. Summary- Energy Audit Findings • We performed a detailed site water and energy audit to identify sources of potential energy and cost savings • In general, the equipment and systems work well considering their age. Efficiencies can be found in commissioning and balancing of the HVAC systems. Additionally, balancing can establish building pressurization requirements. • The audit found X measures costing under $XX,000 with a projected simple payback less than X year(s). Selected measures on next slide.

  7. Measure SelectionSee Appendix for Measure Specifics

  8. Measure Implementation Timeline Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

  9. Sustainability Metrics See below for the scorecard that will be used to track the success of this program.

  10. Appendix- Measure Details

  11. Measures This is a list of the recommended measures with more detailed descriptions that follow in this appendix: • Optimize HVAC Distribution Systems Efficiency • Improve Ventilation Efficiency • Insulate Heating Piping • Rebalance the Variable Air Valve (VAV) and Adjust the Air Handling Unit (AHU) Pressure • Eliminate or Downsize Existing HVAC Systems • Operate Boiler System More Efficiently • Install Daylight Sensors • Commission Occupancy and Motion Sensors • Coordinate with Nighttime Staff to Minimize After-Hours Lighting and HVAC Use

  12. Optimize HVAC Distribution Systems Efficiency

  13. Improve Ventilation Efficiency

  14. Insulate Heating Piping

  15. Rebalance the Variable Air Valve (VAV) and Adjust the Air Handling Unit (AHU) Pressure

  16. Eliminate or Downsize Existing HVAC Systems

  17. Operate Boiler System More Efficiently

  18. Install Daylight Sensors

  19. Commission Occupancy and Motion Sensors

  20. Coordinate with Nighttime Staff to Minimize After-Hours Lighting and HVAC Use