1 / 20

The LHCb Vertex detector

The LHCb Vertex detector. Physics Goals Properties and consequences LHCb Overview of the detector Vertex Specifications Silicon stations Overview Details Radiation hardness Read-out chip developments Conclusions & Prospects.

roscoem
Télécharger la présentation

The LHCb Vertex detector

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The LHCb Vertex detector • Physics • Goals • Properties and consequences • LHCb • Overview of the detector • Vertex • Specifications • Silicon stations • Overview • Details • Radiation hardness • Read-out chip developments • Conclusions & Prospects Vertex2003, Sander Klous (on behalf of the LHCb collaboration) 15/9/2003

  2. Bs Dsp h g b r 0 1 Bs DsK Accessible by LHCb Current status PhysicsGoals • Investigate difference between Matter and Antimatter • CP violation in standard model • Rotation between mass eigenstates and weak eigenstates (CKM matrix) • Expressed with Wolfenstein parameterization • One of the 6 Unitary Triangles • Order l or l2 for all sides

  3. b P P b P P b b PhysicsProperties and consequences • You want B decays! • B’s are heavy • Results from B – factories • LHCb offers • Bs production • Higher yield • Over constrained triangle • LHC Production channel • Gluon fusion ~ 1012 bb pairs a year • Boosted system (decay length) Angular coverage • 15–300 mrad in bending plane • 15-250 mrad in non-bending plane

  4. LHCbOverview of the experiment Luminosity: 2 . 1032 cm-2s-1

  5. Vertex detectorSpecifications • Forward detector • Detectors only 8 mm from beam • 360º coverage in f • overlapping detectors • Low number of pp interactions per event • In level-0 trigger (40 MHz) • Pile – Up detector • Trigger on high pt displaced tracks • In level-1 trigger (1 MHz) • Standalone track reconstruction • Use stray field to select high pt • Identify Bs oscillations • Vertex resolution: 17 mm + 32mm/pt 44 fs (Dsp) • 5s sensitivity to Bs oscillations with: Dms = 68 ps-1 • Tight material budget

  6. y y pitch from 40 to 103 mm x x Second metal layer Interaction region s = 5.3cm Vertex has standalone track and vertex reconstruction (Projection in R-z plane) 45º segments 8 mm 42 mm Pile - Up stations A 21 + 2 Highest x-y resolution naturally closest to interaction region Stereo -20° and 10° R 250 mrad 1meter z 15 mrad A AA Vertex detectorSilicon stations Trigger: Talk on Wednesday, Thomas Schietinger Temperature -5 ºC CO2 Cooling system Thickness 220 mm

  7. Retractable detector halves for beam injection Silicon stations in vacuum R detector Phi detector Beam Thin exit foil Vertex detectorOverview Detector on X-Y tables

  8. Bellows to accommodate retractable detector halves • Thin separation between silicon stations and beam • Secondary vacuum • RF shield • Wakefield guide • Controlled pressure • 250 mm thick • Complex shape (overlapping detectors) • Super plastic, hot gas formation Vertex detectorDetails

  9. Middle station Far station Vertex detectorRadiation hardness Radiation hardness • Replace detectors every 4 years • Maximum irradiation per station 5 x 1012 to 1.3 x 1014 neq/cm2/year • Detector could have undepleted layer after irradiation • Resolution of p on n detector degrades fast • Undepleted layer insulates strips from bulk • n on n ~100% efficient for only 60% depletion depth

  10. Pipeline cells Front-ends Read-out (Beetle)Introduction • Beetle was selected in January 2003 • Used in Vertex Detector and Silicon Trackers • 0.25 mm CMOS technology • Intrinsically radiation hard • Single Event Upsets • Triple redundant logic • Analogue and digital output • Digital output used in level-0 • Analogue output used in level-1 to comparator (digital out) Vpre Vsha Readout x 186 Out In Mux Ipre Isha Ibuf x 128 Pipeline Front-end

  11. Beetle1.1 • Tested in SPS beam • 16 chips on 1 hybrid • PR02-R p-on-n detector 90% Rise time Spill over 10% 25 ns Read-out (Beetle)Analogue specifications • 40 MHz clock frequency • 1 MHz read-out • Signal / Noise > 14 • Rise time < 25 ns • Spill over < 30 %

  12. Peak 3 ns Signal snoise Baseline 3 ns Spill over point Read-out (Beetle) Analysis Convolution of Landau and Gaussian • Goal • Optimize performance • Check chip behavior • 16 chips on 1 hybrid • Test beam environment • Mimic LHCb operation • Sampling mode • Sampling rate • Took 10 million events

  13. m m Efficiency enc (e-) Threshold = 14 Hits from previous bunch crossing Read-out (Beetle)Results Average capacitance: 10 pF Signal/Noise = 17.4  0.2 Spill over = 36.1 %  1 Rise time = 23.5 ns  0.5 ENC = 500 + 50 e-/pF Detector capacitance : 6 - 14 pF Resulting S/N range: 14.5 - 21.5

  14. No deteriorating effects were found Test beam mode: 19.7  0.2 Single time sample: 19.6  0.2 Test beam mode: 18.7  0.2 High trigger rate: 18.7  0.2 Note: comparison with other settings Mimic sampling rate Occupy read-out circuit Send test pulses at high rate Mix with physics triggers Let ADC only read physics triggers Test beam mode Time 2 3 4 5 6 1 7 0 Time sample Continuous beam LHCb sampling mode Time 2 3 4 5 6 1 7 0 1 Time sample Read-out (Beetle)Mimic sampling mode/rate

  15. Silicon and Read-outTo do Beam test with irradiated Czochralski silicon To do: • Analysis of beam tests • Irradiated Czochralski silicon • Single Beetle1.2 chip • Beam test with new hybrid • 16 Beetle1.2 or 1.3 chips on hybrid • Thinner detectors • 3D detectors ??? • High resistance • High oxygen content

  16. Conclusions • LHCb is a next generation experiment for CP violation measurements • The vertex detector for LHCb is a mechanically challenging project • Production has started • The silicon and hybrid developments are in their final phase • Results from the beam test with irradiated Czochralski silicon are coming • The new hybrid will be tested in the test beam with 16 Beetle1.2 chips • The Beetle read-out chip developments are in their final phase as well • Version 1.1 is extensively tested and complies almost with specifications • Version 1.2: a single chip is just tested in the test beam • Version 1.3 is the final version and is submitted on a MPW run in June • Next year, system tests will start • The construction of the LHCb vertex detector is on track

  17. Level-0 trigger combines High pt info from calorimeters and muon detectors Pile - Up information from Pile – Up detector Counts number of primary vertices per event 2 dedicated stations in the vertex detector Digital read-out at 40 MHz Outside acceptance Level-1 trigger Identify displaced tracks at 1 MHz Low occupancy High efficiency R/Phi configuration Match with high pt tracks B A Station: RA/RB = ZA/ZB = k RB RA Vertex ZA ZB LHCbVertex and Trigger Trigger: Talk on Thursday, Thomas Schietinger

  18. b + g b dg g - 2dg b P P b g P P b b PhysicsProperties and consequences • You want B decays! • B’s are heavy • Results from B – factories • LHCb offers • Bs production • Higher yield • Over constrained triangle • LHC Production channel • Gluon fusion ~ 1012 bb pairs a year • Boosted system

  19. For Bssdecay is in the order of a few mm LHCbSpecifications • Angular coverage • 15–300 mrad in bending plane • 15-250 mrad in non-bending plane • Trigger on displaced vertices • Excellent vertex resolution • Single pp interactions • Particle identification • K/p separation • Flavor tagging • 1 – 150 GeV

More Related