'Ramp rate' diaporamas de présentation

Ramp rate - PowerPoint PPT Presentation


Power Plant Asset Management

Power Plant Asset Management

Power Plant Asset Management. Cost Analysis and Cost-Based Power Plant Asset Management –Thermal Power Plant Cycling Costs. Presented by Steven A. Lefton Nikhil Kumar Intertek APTECH 601 West California Avenue Sunnyvale, California 94086 USA Phone: 408-745-7000; Fax: 408-734-0445

By JasminFlorian
(947 views)

* * NREL July 5, 2011

* * NREL July 5, 2011

Tradeoffs and Synergies between CSP and PV at High Grid Penetration. * * NREL July 5, 2011. Bottom Line. As penetration of variable generation (solar, wind) increase, it is increasingly important to consider the interaction between these resources and the entire grid system

By penn
(171 views)

Emissions from Coal in High Wind Scenarios

Emissions from Coal in High Wind Scenarios

Emissions from Coal in High Wind Scenarios. David Luke Oates RenewElec Project Department of Engineering and Public Policy Carnegie Mellon University Advisor: Paulina Jaramillo USAEE Concurrent Session October 11, 2011. A baseloaded coal unit. A Texas Coal Unit. Source: CEMS 2008.

By chas
(103 views)

New IBIS Cookbook

New IBIS Cookbook

New IBIS Cookbook. 1.0 Introduction 1.1 Quick Overview of an IBIS File 1.2 Steps to creating an IBIS Model 2.0 Pre-Modeling Steps 2.1 Basic Decisions Model Version and Complexity Specification Model vs. Part Model Fast and Slow Corner Model Limits Inclusion of SSO Effects

By yonah
(171 views)

PGC tests

PGC tests

PGC tests. Test procedure and acceptance criteria for the P owering of G roup of C ircuits EDMS No 916266. PGC 1 : tests in the arcs. PGC 1.2 PGC 1.3 PGC 1.4 PGC 1.5. PGC 1.6. PGC 1 : tests in the matching sections. PGC 1.8 PGC 1.9.

By walda
(188 views)

Thomas Jefferson National Accelerator Facility

Thomas Jefferson National Accelerator Facility

Magnetic Measurement of the 10 kW, IR FEL Dipole Magnets *. T. Hiatt † , K. Baggett, M. Beck, G. Biallas, D. Douglas, K. Sullivan and C. Tennant. Thomas Jefferson National Accelerator Facility, 12000 Jefferson Avenue,Newport News, Virginia USA 23606.

By leroy
(112 views)

HP-PS design progress: Super-ferric magnet option

HP-PS design progress: Super-ferric magnet option

HP-PS design progress: Super-ferric magnet option. Yannis PAPAPHILIPPOU. LAGUNA-LBNO HP-PS design Meeting 24/ 09/2012. `. HP-PS parameters. Getting 2MW power not straight-forward (even with a fully dedicated linac ) Ramp rate, space-charge, losses, acceptance, space (cost)

By vlad
(107 views)

CSCM: The measurement cycles (at least the one for the RB)

CSCM: The measurement cycles (at least the one for the RB)

CSCM: The measurement cycles (at least the one for the RB). Arjan Verweij 12 may 2011. T=20 K (error to be defined). I. t plateau. I plateau. Typical cycle. Fast ramp down if V> V thr. dI / dt. FPA if V> V thr. dV / dt to open the diodes. t1. t2. t.

By kuri
(79 views)

HQ test at CERN: overview and protection studies

HQ test at CERN: overview and protection studies

HQ test at CERN: overview and protection studies. H. Bajas. OUTLINE. Training curve at 4.2 K and 1.9 K Ramp rate study Final test main results. OUTLINE. Training curve at 4.2 K and 1.9 K Ramp rate study Final test main results. Training curve at 4.2 K and 1.9 K. 16,216 kA 184 T/m.

By elia
(59 views)

Ramped superferric dipole magnet for NESR

Ramped superferric dipole magnet for NESR

COOLSB2. Ramped superferric dipole magnet for NESR. Hanno Leibrock, GSI Darmstadt Kick-off meeting for EU Design Study "DIRACsecondary-Beams" for the FAIR project April 14-15, 2005. NESR in FAIR. FAIR Stage 1. versatile storage ring NESR. decelarated beams => ramped dipoles. Tasks.

By tahlia
(145 views)

VGS Study Benefits of Leveraging Diversity across the Western Interconnection

VGS Study Benefits of Leveraging Diversity across the Western Interconnection

Project team N. Samaan, Y. V. Makarov, T. Nguyen, C. Jin, R. Hafen, R. Diao, X. Guo, and M. Elizondo Pacific Northwest National Laboratory (PNNL) M. Milligan, and K. Orwig National Renewable Energy Laboratory (NREL) B. Nickel, M. Mizumori, M. Hunsaker, and H. Pacini

By lada
(179 views)

Universality and Dynamic Localization in Kibble- Zurek

Universality and Dynamic Localization in Kibble- Zurek

Universality and Dynamic Localization in Kibble- Zurek. Michael Kolodrubetz Boston University In collaboration with: B.K. Clark, D. Huse (Princeton) A. Polkovnikov , A. Katz (BU). Kibble- Zurek Scaling. Disordered. Ordered. Kibble- Zurek scaling. Ramp rate.

By emma
(138 views)

06/04/2008 Open Loop Test Review of Observations and Issues

06/04/2008 Open Loop Test Review of Observations and Issues

06/04/2008 Open Loop Test Review of Observations and Issues. 06/04/2008. Agenda. EOC Submittals Metrics for today’s test Missing EOC’s for 6/5 Offer Curve Issues Proxy Curves Ramp Rate Issues Results for 6/4 Testing Roll Call. Antitrust Admonition. ANTITRUST ADMONITION

By derica
(117 views)

June 16, 2009 Michael W. Howard, Ph.D. Sr. Vice President, R&D Group

June 16, 2009 Michael W. Howard, Ph.D. Sr. Vice President, R&D Group

Renewable Resources and Operational Challenges. June 16, 2009 Michael W. Howard, Ph.D. Sr. Vice President, R&D Group. The Electric Power Research Institute. RD&D Consortium for the Electricity Industry. Independent, unbiased, tax-exempt collaborative research organization

By jeneva
(117 views)

Ramp Rate for Congestion Management and Delivering Ancillary Services

Ramp Rate for Congestion Management and Delivering Ancillary Services

Ramp Rate for Congestion Management and Delivering Ancillary Services. Resmi Surendran. Observations. Issue Too much AS capacity reserved in single Resource Effect

By mary
(115 views)

Nodal Advisory Task Force

Nodal Advisory Task Force

Nodal Advisory Task Force. Update for TAC November 4 th , 2010. TAC Update from Nodal ATF. Met October 5 th , 26 th , and November 2 nd . DAM Deep Dive Each Thursday @ 10am Next few meetings scheduled for: Tuesday, November 9 th , 2010 - AS Capacity Expectations

By maili
(252 views)

Congestion Management and Ramp Rate for Delivering Ancillary Services

Congestion Management and Ramp Rate for Delivering Ancillary Services

Congestion Management and Ramp Rate for Delivering Ancillary Services. Resmi Surendran. Observations. Issue Too much AS capacity reserved in single Resource Effect

By alexa
(128 views)

Operational Issues & Risks ERCOT Operations Planning August 22, 2008

Operational Issues & Risks ERCOT Operations Planning August 22, 2008

Operational Issues & Risks ERCOT Operations Planning August 22, 2008. Topics Covered. Risks Associated with Wind Generation Ramp Rate Challenges WGR Survey Meteorological Data Requirements High Frequency Relay Proposal SPS Operation Requirements. Risks Associated with Wind Generation.

By akamu
(116 views)

WGR Ramp Rate in Nodal: “As High as Possible”

WGR Ramp Rate in Nodal: “As High as Possible”

WGR Ramp Rate in Nodal: “As High as Possible”. Mike Grimes for QMWG Meeting 10 August 2009. WGR Ramp Rate in Nodal: “As High as Possible”. SCED computes new base point assuming ramp is limited to registered ramp rate

By quasar
(145 views)

MP3 report – week 15 6/4/2010 – 11/04/2010 9 interventions + 10A/s ramp rate testing

MP3 report – week 15 6/4/2010 – 11/04/2010 9 interventions + 10A/s ramp rate testing

MP3 report – week 15 6/4/2010 – 11/04/2010 9 interventions + 10A/s ramp rate testing. MP3/QPS team in CCC. Extraction switches problems. Intervention on Monday for a RB.A78 energy extraction switch. Micro-switch problem Intervention on Tuesday for a RQTD.A81B1 energy extraction switch

By tessa
(135 views)

View Ramp rate PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of Ramp rate PowerPoint presentations. You can view or download Ramp rate presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.