1 / 10

LCLS Organization

LCLS Organization. CF Construction Organization. *SLAC UTR Additional support from lab CEF Engineering and UTR support. Brad * Youngman Const Mgr. DESIGN ORGANIZATION. David Saenz Project Manager - LCLS . Lesley Harper/Steve Hill Project Manager - JFI . Mo Siddiqi

shino
Télécharger la présentation

LCLS Organization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCLS Organization

  2. CF Construction Organization *SLAC UTR Additional support from lab CEF Engineering and UTR support Brad * Youngman Const Mgr

  3. DESIGN ORGANIZATION David Saenz Project Manager - LCLS Lesley Harper/Steve Hill Project Manager - JFI Mo Siddiqi Project Executive - JFI Design Peer Reviews Arlington Office - JFI Brian Scanlon Quality - JFI Constructability Reviews Bill Tomb, Don Hotaling, Ron Drake Architecture Richard Bambam Consultant Civil/Structural Kirk Warnock Mech/FP/Plumb Mike McMillan Electrical Rich Pisula Tunnel Jonathan Taylor Project Services Conv. Facilities:Rich Pisula CLOC:Andy Huynh Controls:John Beaudry Fire Alarm:Mike DiPasquale TelecomMike Hedlind Landscape Architect Vibration Value Engineering Conventional Facilities:Mike McMillan CLOC:Ben Entezam Conventional Facilities: CLOC: Rick Vincent Irwan Halim Conventional Facilities:Kirk Warnock CLOC:Martin Huang Utilities:S. Chandramouli Estimating:Joe HeaveyMike Mills Scheduling:Marc Glasser Project Controls:Kent Pimentel

  4. David Saenz LCLS Conventional Facilities Systems Manager

  5. Roles and Responsibilities • Systems Manager and Deputy Systems Manager • Reports to Project Director • Conduct design reviews • Responsible for overall project planning, scheduling and cost estimating for WBS baseline • Approve all Level 4 change control proposals • Present change control proposals to Configuration Control Board • Ensure all work is planned and executed in accordance with SLAC and LCLS ESH and ISEMS procedures • Serve as a board member of the Configuration Control Board • Line responsibility for execution of the work to be performed safely, on-schedule and under budget

  6. Roles and Responsibilities • WBS Managers (Project Managers) • Reports to Systems Manager and Deputy Systems Manager • Plan and manage the design, construction, installation and commissioning of their respective WBS systems • Participates in project planning, scheduling and cost estimating • Approve all Level 4 change control proposals • Ensure all work is planned and executed in accordance with SLAC and LCLS ESH and ISEMS procedures • Identifies potential hazards and ensures that appropriate hazard mitigation measures are implemented • Coordinates review with relevant SLAC Citizen Committees • Prepares technical scope and specifications of work to be performed • Assist Purchasing in evaluation and selection of qualified bidders • Reviews and approves submittals, shop drawings and RFI’s • Conducts regular and frequent job site inspections • Conducts post-mortem review and lessons learned to develop suggestions for improvements

  7. Roles and Responsibilities • University Technical Representative (UTR) • Reports to Systems Manager and Deputy Systems Manager • Oversee the execution of the work, ensuring that technical specifications defined are met and that work is being performed to meet project expectations • Review site specific safety plan, job safety analysis and relevant material safety data sheets prior to start of work • Ensure permits and training has been obtained • Determine competent person has been designated • Provide oversight for high-risk activities • Conduct regular job site inspections • Reviews and approves submittals, shop drawings and RFI’s • Accepts completed work

  8. Potential Change Order Process in Place

  9. Submittal Process in Place

  10. RFI Process in Place

More Related