LCLS Conventional Facilities Organization

LCLS Conventional Facilities Organization. Bob Law. CF Construction Organization. Bill Jangraw TCCO Project Exec. SLAC SME and UTR Support. David Saenz LCLS Conventional Facilities Systems Manager . Tom Malloy Sr. Project Manager. Bill Jangraw Project Executive. Patrick Doig

lucky
Télécharger la présentation

LCLS Conventional Facilities Organization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCLS Conventional Facilities Organization Bob Law

  2. CF Construction Organization Bill Jangraw TCCO Project Exec SLAC SME and UTR Support

  3. David Saenz LCLS Conventional Facilities Systems Manager Tom Malloy Sr. Project Manager Bill Jangraw Project Executive Patrick Doig Project Manager (Tunnel) James Tubbs Project Manager (Building) Dan Goodman Safety Manager (Onsite) Andrew Leone Safety Engineer Anil Dean Project Engineer (Tunnel) Ken Worthley Inspector (Tunnel) Scott J. Kibby Richard Needham Anthony Comelo Assal Yavari Engineering Staff (Building)

  4. Roles and Responsibilities • Systems Manager and Deputy Systems Manager • Report to Associate Project Director • Conduct design reviews • Responsible for overall project planning, scheduling and cost estimating for WBS baseline • Manage CM/GC, Turner Construction Co • Manage Change Orders with Procurement • Integration Management Team • Approve all Level 4 change control proposals • Present change control proposals to Configuration Control Board • Serve as a board member of the Configuration Control Board • Ensure all work is planned and executed in accordance with SLAC and LCLS ESH and ISEMS procedures • Line responsibility for execution of the work to be performed safely, on-schedule and under budget

  5. Roles and Responsibilities- CF UTR Group Leader • Report to Systems Manager and Deputy Systems Manager • Plan and manage CF construction, installation and commissioning • CF Liaison with SLAC ES&H, Area and Facility managers • Participate in project planning, scheduling and cost estimating • Manage Field Change Orders (FCO) with Procurement • Ensure all work is planned and executed in accordance with SLAC and LCLS ESH and ISEMS procedures • Identify potential hazards and ensure that appropriate hazard mitigation measures are implemented • Coordinate design and impact review with relevant SLAC Citizen Committees • Prepare technical scope and specifications of direct contract work to be performed • Assist Purchasing in evaluation and selection of qualified bidders • Review submittals and RFI’s • Conduct regular and frequent job site inspections • Conduct post-mortem review and lessons learned to develop suggestions for improvements

  6. Roles and Responsibilities • University Technical Representative (UTR) • Reports to CF Field Construction Group Leader and CF Engineering Group Leader • Assist in design, specification, and scheduling of direct procurements and direct contracts • Review site specific safety plans, job safety analyses and relevant material safety data sheets prior to start of work • Ensure permits and training have been obtained • Determine competent person has been designated • Provide oversight for high-risk activities • Manage the execution of the work, ensuring that technical specifications defined are met and that work is being performed to meet project expectations • Conduct regular job site inspections • Review and approve SLAC specific submittals, shop drawings and RFI’s • Inspect and accept completed work in cooperation with SLAC Building Dept.

  7. UTR/Contractor Contact

  8. Sector 20 Construction

  9. NEH/CUP Excavation Area

  10. FFTB Activated Soil Excavation Research Yard

  11. 102 A/B Demolition

  12. 113 High Bay Demolition

  13. Path Forward • Condition GC subcontractor and lower tier subcontractors to DOE Work Environment and ISEMS. • Zero Accidents is the Goal • Manage safe and efficient construction • Manage Field Changes