An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PIP Update Feb12th2014

  2. Agenda • Summary Update • Current Activities/Updates • Upcoming Talks, Reports, Meetings Updates/Talks: • CY Tan – LOCO for Booster

  3. Update • Linac SBK – kickoff meeting with CPI to discuss all specs items. No surprises. PDR next month. • Linac Laser Notching – working on timing and electronics • Modulator work – EE: Progress on 9 cell moving along – SLAC: issues with the current design which does not accommodate a feedback system. Team is on schedule to make decision about which design PIP should proceed: EE support or SLAC • Booster Beam: Issues with current damper system over weekend. Difficult problem. • Transverse damper – no news • Cogging software work continues – working on higher gain and running both systems at same time • Booster optics software – today’s talk • Booster Longitudinal dampers - no news • Booster RF • Booster RF 13 cavity is in test stand – vac sealed and spark rate is down. Ready for installation next week?? • Booster RF3 work has started – ready for teststand soon • Cone work continues – in a week work load will reach a difficult point without a cavity swap • New Cavities – working to set some cavity design specifications • Perpendicular Cavities – progress on simulations and testing of TRIUMF cavity – working on solenoid design. • High mu cores – National is shipping two cores that did not quite reach μ and going to run another batch • Booster Anode Supplies –EE personnel visit the company • Working towards completing design signoff this month! Want to install this summer shutdown. • Booster Bias supplies – Work being done with EE supt. help - plan to have a prototype done in Feb. • Booster Shielding – had meeting with safety – add few more chipmunks enough to receive a level 1 exemption due to machine protection.

  4. Recent PIP Budget/News • Budget Issues: none • Labor: looks low • General: • PIP2: Work for upcoming review • Keeping an eye on it for impact to PIP • PIP talks planned • Quarter report • PMG – Feb

  5. Upcoming Talks Future Meetings to be Scheduled: • Pat Sheehan – Booster Bias Supplies • Tom Kubicki – New Booster Cavity Plan • Ryan Crawford – Booster Anodes • Eddy – Booster damper plans • CY Tan – Perpendicular Cavities • Bill Pellico - Loss Scans and Shielding Assessment • John Reid - Solid State Installation - Final Report