60 likes | 188 Vues
Grande PIXEL Integration at SR1 Sébastien MICHAL March 15 st 2012. OPTION 01. Control room. IBL brazing tool close the testing space. nSQP preparation area. IBL insertion table. Co2 cooling. IBL Integration stand. DST. ITT. IBL Testing area. SAS. IBL brazing tool.
E N D
Grande PIXEL Integration at SR1 Sébastien MICHAL March 15st 2012
OPTION 01 Control room • IBL brazing tool close the testing space nSQP preparation area IBL insertion table Co2 cooling IBL Integration stand DST ITT IBL Testing area SAS IBL brazingtool
OPTION 01 Working area IBL Testing area IBL brazingtool DST ITT nSQP preparation area IBL Integration stand SAS IBL insertion table Control room
OPTION 02 Control room IBL brazingtool Co2 cooling Integration stand DST ITT nSQP preparation area SAS IBL Testing area
OPTION 02 Control room IBL brazingtool Co2 cooling IBL integration stand: Fixloadingharm ITT nSQP preparation area SAS IBL integration stand: movable table + MPC IBL Testing area
OPTION 02 • Need to integrate IBL thin table on movable table of the IBL integration stand for IBL package insertion on the ITT