1 / 8

SciBar for Booster Neutrinos

March 30, 2005. SciBar for Booster Neutrinos. T. Nakaya (Kyoto). 1. Introduction. SciBar Fine-segmented Full-active scintillator tracker FNAL Booster Beamline Intense Low-energy neutrino beam ➾ A Precision Neutrino Scattering Experiment. 2. Physics Motivation.

thane
Télécharger la présentation

SciBar for Booster Neutrinos

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. March 30, 2005 SciBar for Booster Neutrinos T. Nakaya (Kyoto)

  2. 1. Introduction • SciBar • Fine-segmented Full-active scintillator tracker • FNAL Booster Beamline • Intense Low-energy neutrino beam ➾ A Precision Neutrino Scattering Experiment

  3. 2. Physics Motivation • Neutrino Run (target: 5E19 POT, 3 months ?) • nm CCQE • Precise fluxs measurement for MiniBooNE. • If the flux information is available from HARP, it can provide the precise s measurement for T2K. • nm CC-coherent p • Give a definite conclusion to the forward m deficit in CC n interaction. How small is s( CC-coherent p)? • nm CC-resonant p • Important mode as background for T2K nm disappearance. • nm CC-DIS • It is important to check the Bodek-Yang collection at low q2. However, I have no idea how to study it with SciBar data. • ne CC • Precise measurement for MiniBooNE ne search. • p0 • ds/dpp0 measurement for MiniBooNE and T2K. • If CC-coherent p is suppressed, how small is NC-coherent p0? Is the NC-coherent s consistent with the result by Aachen at 2GeV? Is the relation of CC/NC=2 for coherent p correct? • Single g (DNg) production [n+n(p)  CC:mgp ,or NC:ngn(p) ] • The first measurement for an important background mode of T2K MiniBooNE and T2K. Can we reject p0 background to search for the single g production?

  4. 2. Physics Motivation (continue) • Anti-Neutrino Run (target: 10E19 POT, 6 months ?) • nm CCQE • The first anti-neutrino s measurement. It is important for T2K-II. • nm CC-coherent p • This is a good check for neutrino s(CC-coherent p) measurement since the background is smaller in anti-neutrino. • p0 • The first(?) p0 data in low energy neutrino. • NC-coherent p0 signal with less background. • In SciBar, NC-coherent p0 measurement may be only possible with anti-neutrino beam because of the large non-coherent p0 background in neutrino mode.

  5. 3. What we can provide and what we may request. • Provide • Full SciBar detector with electronics. • Man power (~5 FET?) and expertise to install and build the SciBar detector at FNAL. • EM calorimeter ?? I have to ask K2K Italian colleague. • If we are approved, Japan-US research fund for travel expense, shipping and operation. • Request • MRD • Help of manpower during installation. • We may need 10~20 people/day for 2 months. • High Voltage Power supply for 224 MA-PMTs. • We have a very old HV system used for the TRISTAN experiment 20 years ago. I expect that the Lecroy HV system used for KTeV may be available. • Experimental Hall with air-conditioner and crane. • With the recent study by Morgan, it looks like that we should locate the detector on-axis to get fruitful physics.

  6. 4. Possible collaborators from K2K. • Kyoto • K. Nishikawa, T. Nakaya, M. Yokoyama, 1 Post-Doc., ~3 students • KEK • Y. Hayato, + a few members? • Other K2K institute • I never asked this to the K2K collaboration. Possibly, some collaborators may join.

  7. 5. Schedule (as my guess)

  8. 5. Schedule (continue) • Limitation • In Japan, we will get the fund in April, 2006 in the earliest case. • I guess that the experimental hall is not ready before summer 2006. • In summer 2008, we start installing a neutrino detector for T2K. T2K starts in April, 2009.

More Related