40 likes | 160 Vues
The agenda for the HIFI Science Verification Review Meeting held on April 20-21, 2006, at SRON Groningen in room 161 outlines a comprehensive schedule. It includes coffee introductions, presentations from the Review Board, and overviews of the HIFI Science User Requirements and Instrument Specifications. Key topics include instrument testing results, performance evaluations, and future test and calibration plans. The schedule also features breaks, lunch, and an evening social event, providing an opportunity for networking among attendees.
E N D
HIFI Science Verification Review Review meeting agenda
20 April 2006 SRON-Groningen, Zernike building room 161 10:00-10:30 Coffee Introduction • 10.30 Welcome and logistics (HIFI) • 10.40 Review Board perspective (Pilbratt) • 10.50 Details and organisation of the review(HIFI) • 11.00-11.15 HIFI Science User Requirements Summary(ThdG) • 11.15-11.30 HIFI Instrument Specifications Summary (NDW) Instrument models and test campaigns • 11.30-12.00 Overview of tests and test campaigns: CQM-ILT, CQM-IMT , • PFM 1, and PFM 2 (WL) Review of Test results • CQM-IMT • 12.00-13.00 FPU: Thermal performance; EMC; …. 13:00-14:00 Lunch HIFI SVR 20/21-04-2006
Review meeting agenda (cnt.) 13:00-14:00 Lunch • 14.00-14.30 LO Performance, incl. noise, line width, etc. • 14.30-15.00 Spectrometers performance, incl. stability, • 15.00-15.15 ICU-AVM/CFM/.. performance, 15:15-15:30 Tea • FM1 and FM2 results • 15.30-16.00 FPU Optical performance and Signal Beam characteristics • 16.00-16.15 Signal chain performance • 16.15-16.30 LO chains: performance • 16.30-16.45 FPU mechanisms/subunits: DRT, CSA, HBB and CBB performance • 16.45-17.15 Standing waves and instrument stability times • 17.15-17.30 Discussion • 17.30-18.30 Review Board meeting Evening: Social event (“Huize Maas” at the “Vismarkt”; 19.00 hrs) HIFI SVR 20/21-04-2006
Agenda 21 April 2006 Future test and calibration plans • 09.00-09.20 Test facility capabilities and performance • 09.20-10.30 PFM 3 and ILT test and calibration plans: priorities and minimum set. 10:30-10:45 Coffee • 10.45-11.10 Requirements and approach for FM-IST • 11.10-12.00 Requirements and plans for in-orbit calibration, incl. PV phase • Instrument compliance and performance • 12.00-12.30 Compliance with SURD and Instrument Requirements Document /sensitivity model • 12.30-13.00 Discussions and Conclusions 13:00-14:00 Lunch • 14.00-15.30 Board meeting HIFI SVR 20/21-04-2006