1 / 2

Status of T0s calibrations

Meeting on status of calibrations for next seatray production 14-01-2011. Status of T0s calibrations. Agustín Sánchez-Losa (IFIC). I have only knowledge about 6 major calibrations (all done by Paco ) in order to recalibrate all the T0s Incoming set of new T0s for the period #8

tuan
Télécharger la présentation

Status of T0s calibrations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meeting on status of calibrations for next seatray production 14-01-2011 Status of T0s calibrations Agustín Sánchez-Losa (IFIC)

  2. I have only knowledge about 6 major calibrations (all done by Paco) in order to recalibrate all the T0s • Incoming set of new T0s for the period #8 • 2(3) major sets of interline offsets released (both done by Paco), the last one presented in Paris for the period #4 • Incoming release (if not already done) of interline offsets for the period #6 • For G/2, G/4 and G/8 only calibration runes available for G/2 and G/4 (G/8 not found) • Interline offsets for period #7 and #8 could be performed in a few weeks #1 #2 #3 #4 #5 #6 #7 #8 5 Lines 10 Lines 12 Lines HV L10-L12+offsets HV L6-L9+HV

More Related