1 / 5

MICE Video Conference Reception of FC magnets

MICE Video Conference Reception of FC magnets. Andy Nichols, STFC, 19-1-12. FC acceptance. Firstly, this is a very nice problem to have.......! It’s likely that we receive four magnets within a few months of each other (FC*2 and SS*2), between March and October 2012

tyanne
Télécharger la présentation

MICE Video Conference Reception of FC magnets

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE Video ConferenceReception of FC magnets Andy Nichols, STFC, 19-1-12

  2. FC acceptance • Firstly, this is a very nice problem to have.......! • It’s likely that we receive four magnets within a few months of each other (FC*2 and SS*2), between March and October 2012 • MICE phased assembly, steps II & III, might have allowed series integration in the MICE hall • But given our current step IV plan and the above, we need to work in parallel on integration and have space for storage • Space is always a contentious issue at RAL, but we managed to get our hands on building R9 • The basic idea is to build a parallel magnet facility • Immediate plan is for acceptance trials of FC#1 while LH2 tests and floor building is going on in MICE hall

  3. FC acceptance • This includes: • Cooling • Powering • Absorber integration • Field mapping • And general preparation, measurement, etc • Power has been laid into R9 • Floor is about to be restored and painted • Field simulation has been made and is OK for surroundings • Presently having asbestos removed from pipe insulation • Open questions to Tesla: • Details of handling frame/lifting gear • Details and dimensions of packing and delivery vehicle • All-up ‘as-built’ weight of FC • Position of C of G

More Related