VirtuLab : Web Based Flow Visualization Facility. Final Presentation Team 6 Members : Justin Scott Karen Davis Sydni Credle. Mentor/Client : Professor : Dr. Shih Dr.Luongo. December 7, 2000. Overview. Client Statement Background Information Specifications

1 / 54

Télécharger la présentation

VirtuLab : Web Based Flow Visualization Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VirtuLab: Web Based Flow Visualization Facility Final Presentation Team 6 Members: Justin Scott Karen Davis Sydni Credle Mentor/Client: Professor: Dr. Shih Dr.Luongo December 7, 2000

  2. Overview • Client Statement • Background Information • Specifications • Camera Mount Design • Work Breakdown Structure (WBS) • Scheduling • Complications and Solutions • Goals for the Spring Semester • Conclusion

  3. Conclusion • WBS and Schedule promoted team efficiency towards completion of project goals. • Camera mount design and fabrication were priority this semester. Upon completion, testing and calibration can be performed. • Team members now have an extensive working knowledge of the LabVIEW software.

  4. Conclusion (cont’d) • In developing the user interface, the major concern for team has been the "how" of the matter.

  5. Web-Based Flow Visualization Facility (WBFVF) Work Breakdown Structure (WBS)

  6. Project Schedule Spring Semester Goals

  7. Goals for the Spring Semester Web Page Design • Incorporate LabVIEW programming into design • Embed live video streaming • Background and procedure for experiment • Upload class deliverables for public use

  8. Spring Semester Goals (continued) LabVIEW • Acquire LabVIEW version 6.i • Train team members to use 6.i • Final experiment interface design (educational module) • Consolidate motor controller functions into one program • Control via the Internet

  9. Spring Semester Goals (continued) VC-C4 Web Cam • Order and acquire the VC-C4 camera from Canon, Inc. • Train team members to use VC-C4 web cam software • Create LabVIEW program to automate the control of the web cam • Research WebVIEW software

  10. Spring Semester Goals (continued) Existing Experiment Set-up • Preliminary test of system • Performance Analysis • Design Modifications • Calibration • Final Testing

  11. Complications and Solutions • LabVIEW • Received older version, 5.1, when we were supposed to receive 6.i. • Contacted manufacturer, National Instruments, to rectify the situation (coming soon). • Unfamiliar with the LabVIEW programming language. • Group members trained by attending instructional seminars, using tutorial CDs and utilizing local COE users.

  12. Complications and Solutions (cont’d) • VC-C3 Camera • Through research, we found it was too expensive. • Ordered interim software and components (Intel Camera and Microsoft NetMeeting Software). • Recently received client approval to order the VC-C4 version of the camera.

  13. Complications and Solutions (cont’d) • Web Page (live video streaming) • Underestimation of the task at hand. • Actively sought out professionals • Dr. Van Dommelen • Third floor Webmasters • NetMeeting representatives

  14. Objectives/Client Statement • Design and build a towing tank facility and the associated imaging process. • Provide visualization enhanced information to supplement the teaching of fluid mechanics. • Create computer interfaced instrument control for remote operation via the Internet.

  15. Introduction • Learning/teaching Thermal Fluids is complex. • Distance learning purposes • Pre-lab student aid • Master each component separately • Move at own pace • Real world applications

  16. Background Information • A “fluid” is a substance that readily flows under applied shear (gases, liquids i.e. water, alcohol, gasoline). • Fluids can’t be detected by the human eye, therefore, the concepts behind fluid mechanics prove to be very difficult to learn. • Use of flow visualization to take out the guess work from the phenomena.

  17. Remote Users Physical Laboratory System Set-up (motor controller) LabVIEW Interface

  18. What is LabVIEW? • Laboratory Virtual Instrument Engineering Workbench • Automation and Control of Equipment • “G-programming” • Creation of programs using graphics • Pictorial Block Diagrams instead of long lines of syntax • Straightforward data flow methodology

  19. LabVIEW User Interface • “Front Panel” • Knobs, Buttons, graphs, etc. • User Input using mouse and keyboard • Graphical Code • “Block Diagram” • Constants, built-in functions, program execution control structures • Wires denote data flow

  20. Simple example: Ideal cylinder Vs. Real world cylinder • Ideal circular cylinder experiencing 2-D flow of a uniform stream • Figure (left) shows symmetrical stream lines and no drag force. • Real circular cylinder experiencing a non-uniform flow • Figure (right) depicts the flow separation, creating a wake

  21. Schematic diagram illustrating basic setup of web-based flow visualization system.

  22. Mechanical Design Aspects • Design of mobile camera mounts • Design of synchronous linkage for laser/optical platform • Motor Selection • Linear bearing system

  23. Mechanical Design Aspects (continued) • Gear Analysis • Loading Calculations • Material Selection and Design • Plumbing Design • Setup and design of video recording equipment

  24. Computer Related Aspects • Remote instrument control via the Internet using LabVIEW programming • Video studio design for the lab imaging • Real time video and data streaming via the Internet

  25. System Configuration Motor Camera mount location Towing Tank Web Cam Location Motor Controller

  26. Camera Mount Design Needs • Easily manufactured • Cost efficient • Lightweight • Easily used

  27. Camera Mount Design Needs (Continued) • Capable of supporting camera • Appearance uniform with existing equipment • Locking mechanism • Long lasting

  28. Camera Mount Design: Morphological Chart

  29. Pin/Slider Dovetail 2 Track Easily manufactured + -- + Cost efficient + -- + Lightweight + -- -- Easily used -- + + Capable of supporting camera -- + + Appearance uniform w/ existing equipment -- -- + Locking mechanism included -- + + Long lasting -- + + Total Positive 3 4 7 Specifications for the Camera Mount

  30. Detailed Concept Design • Dimensions • Locking mechanism design • Materials used • Specific cost

  31. Preliminary Design: Exploded View

  32. Existing Camera Mount Adjustable Pole Camera Mount Location

  33. Work Breakdown Structure • Project Management Activities • Refinement of Client Statement • Web Camera • Imaging Camera Mount • LabVIEW - Motor Controller • Simulation/Testing • Web Page Publishing

  34. Project Management • Development of project plans • Weekly Design Team Meetings (2) • Bi-weekly client meetings • Progress Reports for client • Refinement of project plans

  35. Refinement of Client Statement • Clarify customer statement completed • Research prior designs ongoing • Review with client completed

  36. Web Camera • Research software and equipment completed (VC-C3 camera and WebVIEW software = $) • Order interim software and components completed (Intel Camera and Microsoft Netmeeting Software) • Performance tests (Teleconference) completed • Design of system setup • Intranet/Internet capability testing

  37. Imaging Camera Mount • Concept Generation completed • Design Selection completed • Final Design Review completed • Fabrication: ongoing • Ordering materials and components • Assembly

  38. Detailed Designs: 1st Plate and Slider

  39. Detailed Designs: 2nd Plate and Slider

  40. LabVIEW - Motor Controller • LabVIEW • Software Acquisition completed • Introduction to software ongoing • Tutorials • Attend educational seminars (Nov. 9-Orlando, Fl) • Design of the User Interface ongoing • Motor Controller • Introduction to motor controller ongoing • Velocity Profile Manipulation ongoing • Programming using LabVIEW ongoing

  41. Simulation/Testing of Towing Tank • Preliminary test of existing system pending • Performance Analysis pending • Design Modifications pending • Final Testing pending • Calibration pending

  42. Web Page Publishing • Concept Generation ongoing • Design Selection ongoing • Final Web Design ongoing

  43. Work Breakdown Structure • Project Management Activities • Refinement of Client Statement • Web Camera • Imaging Camera Mount • LabVIEW - Motor Controller • Simulation/Testing • Web Page Publishing

  44. Project Update • National Instruments “NI Days” Convention (Orlando, FL - 11/9/00) • Product Overview • LabVIEW 6.i • Software/Hardware Capabilities • Monitoring and Control Over the Web • Contacts • Received New LabVIEW Software

  45. Project Update (continued) • Consultation with Dr. Van Dommelen • Web Page • Basic Design Layout • Media Data Streaming (Audio/Video) • Project Deliverables • Exchange a left-hand threaded component with a right-hand threaded component.

  46. Tentative Final Design Contents • Background Theory/Introduction • Project Scope • Specifications • Design Review • WBS/Scheduling • WBFVF Web Page • Meeting Log • Correspondence • Spring Project Plans

  47. Acknowledgements/Bibliography • Davis, K., Scott J., and S. Credle, Senior Design Proposal: Web Based Flow Visualization Facility, FAMU-FSU College of Engineering, Tallahassee, 2000. • FloWorks, Engineering Fluid Dynamics for SolidWorks, www.floworks.com, 2000. • White, F. M., Viscous Fluid Flow, McGraw-Hill, New York, 1974.

  48. Conclusion • Completed flow visualization system is a critical tool in the analysis of fluid mechanics. • Integration of the physical laboratory with the Internet, in turn creates a virtual laboratory. • The final deliverable will benefit educators, students, and industry.

  49. Conclusions • Comprehension of problem statement has been achieved • Upon of completion of camera mount fabrication, can proceed with simulation/testing of the towing tank • Next: Modifying and calibrating the existing system