Activity in 904

AHMED IBRAHIM. Activity in 904. Reconstruction of RPC. In 904 we reconstructing the RPC. 1 st we make testes for gaps. Gas inlets broke. Visual test. Leak test. 5 mbar by U tube 15 mbar by PLW Recorder. Pressure. Time. Spacer test. Pressure. Pressure. time. time. Pressure. time.

bambi
Télécharger la présentation

Activity in 904

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AHMED IBRAHIM Activity in 904

  2. Reconstruction of RPC In 904 we reconstructing the RPC 1st we make testes for gaps

  3. Gas inlets broke Visual test

  4. Leak test 5 mbar by U tube 15 mbar by PLW Recorder Pressure Time

  5. Spacer test

  6. Pressure Pressure time time Pressure time Spacer test data Pressure Pressure time time

  7. Example of a bad spacers Pressure time

  8. 2nd building the chamber Top gaps Distribution boards Bottom gap

  9. Cosmic Stand

  10. Data of Cosmic Stand

  11. DOUBLE A Efficiency curve DOUBLE B

  12. DOUBLE A Cluster size curve DOUBLE B