Comprehensive Repairs and Enhancements at Richland Creek Sites 14, 107B, and 110
This project involved extensive repairs to multiple sites along Richland Creek, specifically Sites 14, 107B, and 110. At Site 107B, the dam embankment was repaired, and a new 40-foot wraparound emergency spillway was added to improve flood management. Similarly, Site 110 saw the repair of washouts on the backslope and spillway. Site 31 addressed gully erosion in the emergency spillway, while a new fence was installed before the flood event. These repairs were made possible through cooperative funding efforts and support.
Comprehensive Repairs and Enhancements at Richland Creek Sites 14, 107B, and 110
E N D
Presentation Transcript
Repairs to Richland Creek Site 107b • Repaired dam embankment. • Added a 40ft wrap around emergency spillway.
Repairs to Richland Creek Site 110 • Repaired washouts on backslope & emergency spillway.
Repairs to Richland Creek Site 31 • Repair the gully in emergency spillway. • A new fence was installed just prior to the flood event.
A Cooperative Effort • The repairs to the 3 FP sites were funded by:
Richland Creek Site 107B Project Completed June 9, 2010