PACIFIC PARTNERSHIP 2012. 28 MAR 12 OPT Brief. This brief is classified: UNCLASSIFIED. Roll Call. CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F. C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific ETG 30 th NCR HSC-21 DET 2
E N D
PACIFIC PARTNERSHIP 2012 28 MAR 12 OPT Brief This brief is classified: UNCLASSIFIED
Roll Call CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F • C3F • CTF 76 • 351st Civil Affairs Command • DLA Troop Support - Pacific • ETG • 30th NCR • HSC-21 DET 2 • MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict.
PP 12 Weekly Planning Rhythm 1100W read ahead slides posted to APAN CPF N3 Semi-Monthly Update 1200W MED WG Sun Mon Tues Wed Thurs Fri Sat 1200-1400W OPT VTC 1000W COMMS WG 1000W PA WG 1100W CA WG 1200W ENG WG 1300W LOG WG 1300W FP WG Every other week Effective 21MAR
Planning Timeline EXORD PLANORD Mid Planning Conference Initial Planning Conference CPF RFF FSLO Letter MOU Letters Signed PN Invitation letters Final Initial Requirements Systems Assessment plan Country CONOPs Advanced Echelon PDSS Deployment
ADF Planning Status General Planning CJOPS Decision Brief for PP12 signed. Command CMDR Ken Walters, RAN confirmed as Commander Australian Contingent. Small number of ASNCE staff remain to be identified. Engineering 12 engineers confirmed to participate as FIE in Indonesia. Medical All Personnel for ADF Health PP12 positions identified. Credentialing to follow. NO CHANGE
ADF Participation Command Element O-5 Commander and 4/5 support staff. CIMIC 2 personnel. Engineering Section 12 person section. FIE Indonesia & SIE for remainder of mission. Medical Contribution of 20 personnel in each contingent. Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines. Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia. HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au NO CHANGE
PP12 RFI Tracker NO CHANGE
JSDF Planning Status • CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. Vehicles - JMSDF ShipLST“OOSUMI” 2LCACs, 2launches(needs pontoon for get in and out form MERCY) - JASDF Aircraft(C-130orKC-767×1) Medical team - Approximately 20~30 No Change
JSDF Planning Status • Humanitarian community in Japan • - 9 for Philippines(2Dr.s, 1Dentist, 6Nurses) • - 12 for Vietnam (4Dr.s, 1Dentist, 4Nureses, 1Dental hygienist, • 1Dental assistant) No Change
JSDF Planning Status • POC • - PLANNING • PRI: LCDR Haga : j3haga@js.mod.go.jp DSN:224-7714 • SEC: LCDR Yamaguchi : j3yamaguchi_m@js.mod.go.jp • - MED • PRI: CDR Hayashizaki:j4hayashizaki@js.mod.go.jp • - PA • CDR Maeyama: j1maeyama@js.mod.go.jp • - LCAC OPS • LTJG Yoshida: cld1@inet.msdf.mod.go.jp • - OOSUMI • LCDR Manabe: cld1@inet.msdf.mod.go.jp
JSDF Planning Status No Change
NZDF Planning Status NZDF elements confirmed for the duration of the Vietnam phase of PP12 only. SOM as follows: 02 Jul 12: Concentrate at Devonport Naval Base (DNB) 03 Jul 12: Fly to Manila, Philippines. 04 Jul 12: Embark USNS Mercy. 05 Jul 12: USNS Mercy ship familiarisation training. 06 - 09 Jul 12: USNS Mercy transiting to Vinh City, Vietnam. 10 - 24 Jul 12: Mission Conduct: Vietnam. 24 Jul 12: Disembark USNS Mercy / fly domestic to Hanoi (TBC). 25 Jul 12: Depart Vietnam. 26 Jul 12: Return to NZ (over-nighting in DNB). 27 Jul 12: Return to home locations. NZDF – 8 person team composition consists of the following personnel: OIC / Health Planner: Major Paul KENDALL Amphib Ops Health Planner: Chief Petty Officer Andy FINDLAY-CLARKE Medical Officer: Surgeon Lieutenant John NORTH Nursing Officer: Lieutenant Sarah LINEHAN Dentist: Major Mark WORTHINGTON Environmental Health Technician: Warrant Officer Steve HUNN Medic: Leading Medic Kataraina RATAPU Medic: Corporal Stacey JUNE NO CHANGE
CPF FOPS Update • Manning Update • Remain billets ordered in 23 Mar SDOB. • Indonesia EAP is being discussed at CPF • Will provide determination by the end of the week.
Medical Update • Transition to new DMOP – CAPT David Tanen. • Medical Assessment: PI report being chopped. CAM cancelled. RMI will go forward, Tentative date of July. • Staffing – 43/623 billets remain “un-named” – reportedly filled, names have not been forwarded. NGO staffing received from PACFLT. PN staffing progressing. Malaysia and Netherlands joining. • Credential requirements: PACFLT review, decision pending. • CONOPS – Medical Annexes complete, DMOP brief to MTF CO tomorrow. Vet annex due to DMOP 29 MAR. • MRX – LL being compiled. • RON – CPF has approved use of hotels “for all overnight stays in PP12”. Still 2 sites in IND that will likely require RON on-site, perhaps 1 in CAM. Philippine VFA “donated” med requirement – exempt per PACFLT On-track Off-Track/Recoverable Off-Track not recoverable Completed
Engineering Update Site Survey Projects Recommended SMEE Request Philippines 3 schools & 1 medical clinic P&E; Seawall Cambodia 3 health centers Water; Bldg Design Indonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety Philippine Project Package preparation (ACB1 lead) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Engineering SMEE Plan. On-track Off-Track/Recoverable Off-Track not recoverable Completed NO CHANGE
Logistics Update • Logistics WG held 27 MAR12 • Logistics Resource Matrix Completed • Updated contracted Medical Life Support items for Indonesia, Philippines, Vietnam and Cambodia submitted to KOs for contract award • Funding • APRI: Received remaining $2.3K… $1.93M Total • ORF: Working w/ C7F for augment • Pharmaceuticals and Consumables • Donation Material • Next Logistics WG meeting scheduled for 3 APR12
PP12Supply and Logistics StatusFUNDING (28MAR12) 18 Completed On-track Off-Track/Recoverable Off-Track not recoverable
PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (28MAR12) 19 NO CHANGE On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12 Supply and Logistics StatusDONATION MATERIAL (28MAR12) 20 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(28MAR12) 21 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(28MAR12) 22 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(28MAR12) 23 No Change On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status (28MAR12) 24 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(28MAR12) 25 On-track Off-Track/Recoverable Off-Track not recoverable Completed
Force Protection Update • USN Force Protection Asset Status • MESG1 Det Guam (24 EST, 24 Shore, 2 OIC & AOIC) • Travel Reqs near complete • Acquired additional NLW equipment for adequate protection of Mercy • On The Horizon • Det Guam Planning and Completion of FP products • C7F SATP (1st Chop on track for submission next week) • Straights Transit, ISP’s, FP Log Reqs, Mission Commander Briefs • Country Specific Support Requirements (HN and Contracting) • ADVON Travel Tracker Completion • Necessary to complete APACS request • Due 30MAR12 • POC’s: Blue – LCDR Weatherup / LT Adams, Gold – LCDR Palacios / LT Nutting
Force Protection Update Pre-Deployment Travel Requirements ADVON/FIE SIE (Mil) ISOPREP Completed/validated by parent command within last 6 months https://prmsglobal.prms.af.smil.mil/prms215/default.htm AOR location specific brief Completed by embarked N2, NCIS, or FP OIC Level I ATFP (OCONUS) NKO eLearning within last 6 months https://wwwa.nko.navy.mil/portal/home/ SERE 100 B NKO eLearning within last 18 months https://wwwa.nko.navy.mil/portal/home/ • ISOPREP • Completed/validated by parent command within last 6 months • https://prmsglobal.prms.af.smil.mil/prms215/default.htm • AOR location specific brief • Completed by parent command N2 or FPO • Level I ATFP (OCONUS) • NKO eLearning within last 6 months • https://wwwa.nko.navy.mil/portal/home/ • SERE 100 B • NKO eLearning within last 18 months • https://wwwa.nko.navy.mil/portal/home/ • IATP / APACS • Completed by ADVON OIC/AOIC for ADVON and ENG OIC for FIE • https://iatp.pacom.mil/ • https://apacs.dtic.mil/apacs/ NO CHANGE
Projected HN/PN Participation by Mission Country (28 MAR 12)
Projected NGO Participation by Mission Country (28 MAR 12) In-Country NGOs IndonesiaPhilippinesVietnamCambodia Help for Orphans(TBD) Calbayog Rotary Club Compassion Flower M'lop Tapang Hope World Wide GIZ (TBD) Vietnam Woman’s Union The Starfish Project Islamic Medical Society(TBD) Fit for School Cambodian Childrens Painting Project Hope Worldwide
Public Affairs Update • Admin • IND ADVON (tent.) MAJ Cam Jamieson, AUS Army PAO; awaiting confirmation • DVIDS: 2 dishes possibly available as of 27 MAR (Bahrain Det, USARPAC PA); waiting on response from DVIDS HQ for feasibility • Media Coordination • Docu-Series production agreement/funding will be explored during a future mission. No further action required by PP12. • Provided San Diego Union Tribune background on mission for possible embed during a host-nation visit. • Defense Logistics Agency (DLA) requests one-day access/escort to film supply on-load and conduct Supply Corps interviews for educational video week of 23 APR. Pending MTF-CO/MSC approval.
Public Affairs Update On-track Off-Track/Recoverable Off-Track not recoverable Completed
Public Affairs Update On-track Off-Track/Recoverable Off-Track not recoverable Completed
Planning Timeline UPDATED: 28MAR12
Mission Commander Priorities Country CONOPS Development Philippines, Vietnam, Cambodia CONOPS approved by CPF; posted to APAN under “Operations” Indonesia CONOPS approval pending EAP review (CPF) (Status?) CONOPS Engineering Annex (COMPLETE) CONOPS Medical Annex (OVERDUE – routing thru medical COC, with CO MTF) CONOPS Veterinarian Annex (OVERDUE – Estimated completion date?) Mission Logistics / Contracting Requirements Indonesia submitted to contracting officer (revision 4) (COMPLETE) 10APR: Philippines / Vietnam / Cambodia (IN PROGRESS) Medical, Engineering, CMO, etc – conduct thorough review of submissions to ensure your events are properly supplied ADVON Coordinate with OIC/AOICs and provide contact info, passport, GOVCC, ATFP requirements, visas OICs/AOICs disseminate travel information / on-site dates Following positions remain unfilled: Indonesia PAO
Mission Commander Priorities (continued) Voyage Planning MERCY transit plan 291731Z FEB 12; change 1 (C7F transit ONLY) 161808Z MAR 12 CSFTP endorsement: 011817Z MAR 12 C3F approval: 091836Z MAR 12 CTF76 endorsement: 081800Z MAR 12 C7F approval: pending / status? USNS MERCY/CTF76/CTF73: RAS support? Pre-deployment Briefings 27MAR 1500 PDT (272200ZMAR12) – C3F (COMPLETE) 02APR 1730 PDT (030030ZAPR12) – CTF76 (VTC) 09APR 1730 PDT (100030ZAPR12) – C7F (VTC) 13APR 1200 PDT (131900ZAPR12) – CPF (VTC) Final Planning Conference (FPC) / Pre-Sail Conference (PSC) – 11APR12 VTC for all participants (1500 PDT, 2200Z – normal OPT time) Final CONOPS (country SOM) presentation LCS CLASSRON Building 57, Freedom Conference Room for SDGO participants
Mission Commander Priorities (continued) Concerns Indonesia EAP/CONOPS approval Medical Annex (overdue) Veterinarian Annex (overdue) Country-specific contracting requirements – conduct thorough review ORF request message – ORF reduction – impact? Finalizing PN/NGO participation plans (including point of embarkation) – timeline for finalizing? Maintaining forward movement on fast file transfer (FFT) approval and operational testing MERCY SAR swimmer manning – way ahead? Other similar issues? MERCY flight deck certification – commensurate with 09APR ASIR? Helo Air Crew Certification (status?) Require 2-3 sets of NVGs for MERCY flight deck crew
Closing Questions/Comments CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 • 351st Civil Affairs Command • DLA Troop Support - Pacific • 30th NCR • ETG • HSC-21 DET 2 • MCAST • USNS MERCY • CDS-7