
AIRSPACE CONCEPT WORKSHOP CASE STUDY BEIJING, CHINA; 30 JUN-11 JUL 2014
XIAN Info • Area Controls: open 24/7 • Terminal Approach Radar operational: 24/7 • Radar: • Xian: Rwys 05L/R and 23L/R • ILS CAT II RWY23R • Approx 67 arrivals per day
XIAN Info • More than 90% of operators RNAV1/RNP1 qualified • APP vectors many aircraft • Military airspace has not been able to be used
YAV RWY05 LOVRA NUGLA TEBIB HO MIZ NSH
YAV RWY23 LOVRA NUGLA TEBIB HO 0 15 30 45 60 MIZ Nautical miles NSH
0 15 30 45 60 Nautical miles NSH
Rules of Thumb • CDO descent rough starting points: • 3 miles per thousand feet plus 1 mile per 10knots • or • 4 miles per thousand feet • CCO climb rough starting points: • Very Slow climber - 5 miles per thousand feet • Medium climber – 3 to 4 miles per thousand feet • Faster climber – 2 miles per thousand feet • Rocket ship - 1 mile per thousand feet • RNAV Final between 4-5 nm • Curved RNAV? A-RNP - RF prior to FAF?
XIAN • Team Organizer • Team Recorder • Team Name
XIAN 1 - Agree on Operational Requirements • Safety • Capacity • Efficiency • Environment • Access