1 / 6

ATLAS Tracker Upgrade

ATLAS Tracker Upgrade. Team Simon, Sam, Juergen , JW + Kostas and Chris Main activities (responsible for WP 3.5: hybrid production) Gluing, bonding, vacuum (Simon, Sam) Readout tests ( Juergen ) Irradiation tests on cyclotron (JW) : WP 5.7 (Paul Dervan ). Gluing: getting up to speed.

cosmo
Télécharger la présentation

ATLAS Tracker Upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATLAS Tracker Upgrade Team Simon, Sam, Juergen, JW + Kostas and Chris Main activities (responsible for WP 3.5: hybrid production) • Gluing, bonding, vacuum (Simon, Sam) • Readout tests (Juergen) • Irradiation tests on cyclotron (JW) : WP 5.7 (Paul Dervan) Group meeting, 2nd Sept, 2013; JAW

  2. Gluing: getting up to speed • + tests • Measure glue thickness with Astro CMM ? • + new ideas • Rather than curing the glue at room temp (i.e. leave devices under vacuum overnight), can glue be cured at slightly raised temp (+35C) ? • → develop heating panels etc • Advantage: curing in a few hours; faster throughput • to be tested by Simon and Sam

  3. Cleanroom • New bonder well exercised by Simon • bid for new apparatus: Bond Pull Tester Dry Storage Proposed purchase Current model DageBT 22 Dage4000 Group meeting, 2nd Sept 2013, JAW

  4. Testing hybrid (ex-Liverpoool) Lots of technical details overcome by Juergen • cooling • maintain flat via vacuum plate • sensitive to power supply settings; noise Next • Test hybrid glued and bonded in Bham • Understand hybrid operation in detail (plots, as for SCT) Group meeting, 2nd Sept 2013, JAW

  5. Irradiations • Irradiation group: David Parker’s cyclotron ream; Kerry Parker and Paul Hodgson (Sheffield; scanning) ; Paul Dervan (Liverpool; testing) ; JAW (fluence measurement). • Hardware: Richard French and Hector Marin-Reyes (Sheffield) • Programme Irradiate devices in Bham; test in ATLAS institutes (L’pool mainly so far) Plan Continue – lots to do + plan a combined testing effort: bond irradiated devices to pcbs in Bham and then test in Sheffield. Problems: local heating 1μA beam of 27MeV protons deposits 1W approx in 300μm of silicon. So, although in cold box (nitrogen at -10C), devices may anneal. Group meeting, 2nd Sept 2013, JAW

  6. Irradiations so far Regular Tuesday runs on cyclotron → 105 objects irradiated • 4 carbon fibre • 3 materials • 2 sets of JFETs • 96 ATLAS prototype silicon sensors → Main Barrel ATLAS12 finished Imminent: • Barrel ATLAS12 mixed irradiation • Barrel ATLAS12 glued sensors • Endcap ATLAS12 (+60 sensors) • Pixel V (+8 single sensors) • Full size ATLAS12 (Standard and Slim Edge) Summary: programme well under way. Group meeting, 2nd Sept 2013, JAW

More Related