140 likes | 257 Vues
The special PLI2 test on RB A78 was performed on October 3, 2009, from 20:35 to 23:50. The current steps included 0.76A, 1.2A, 1.6A, and 2.0A, with a ramp rate of 10A/s and plateau times exceeding 10 minutes. Data files captured during the test include analyses on bus segment resistance, noise characteristics, and normalized resistance for multiple segments. Special attention was given to the measurement of excess resistances and standard deviations of voltage. Results and data are organized for thorough analysis.
E N D
2kA Splice Mapping Results for RB.A78 • “Special” PLI2.s1 test was done on RB.78 at 03/10/2009, 20h35-23h50; • The current steps: 0,760A,1200A,1600A,2000A,…,0 (9 plateaus) • The ramp rate: 10A/s • The plateau time: >10mins. MP3,07/10/2009, Z.Charifoulline
U_RES_SPLICE vs Time & I_MEAS vs Time MP3,07/10/2009, Z.Charifoulline
A78.RB: BusSegment Resistance vsnQPS Unit (current flow) MP3,07/10/2009, Z.Charifoulline
Noise: StdDev of U_RES on plateaus MP3,07/10/2009, Z.Charifoulline
~2uV MP3,07/10/2009, Z.Charifoulline
A78.RB: Normalized BusSegment Resistance MP3,07/10/2009, Z.Charifoulline
A12.RB: Normalized BusSegment Resistance MP3,07/10/2009, Z.Charifoulline
A78.RB: Normalized BusSegment Resistance MP3,07/10/2009, Z.Charifoulline
A78.RB: Normalized BusSegment Resistance MP3,07/10/2009, Z.Charifoulline
A78.RB: Normalized BusSegment Resistance & Excess MP3,07/10/2009, Z.Charifoulline
Top 7 excess resistances (Rexcess = Rmeas - Nsplice*Rsplice) MP3,07/10/2009, Z.Charifoulline
U_RES(I) = U0 + Rbus*I + {∆α*U_MAG(I)}; U_MAG(I) = U0 + Rmag*I; MP3,07/10/2009, Z.Charifoulline
A8R7,A10R7,A12R7,…,A34R7 <– 27 magnets are missing; MP3,07/10/2009, Z.Charifoulline