1 / 7

Lander Status

Lander Status. The Lander will use a last slot (7 weeks) to perform final refurbishments, while the Orbiter will perform its own. Both Lander sub-systems and instruments will benefit from this activity.

evita
Télécharger la présentation

Lander Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lander Status The Lander will use a last slot (7 weeks) to perform final refurbishments, while the Orbiter will perform its own. Both Lander sub-systems and instruments will benefit from this activity. This will be performed through a program of activity, endorsed by the Lander Steering Committee yesterday, that fits with the overall Mission schedule. The final Lander configuration will match the initially targetted one, towards a full scope successful investigation. JPB, RSWT, 26-06-02

  2. Sub-system refurbishments CDMS replace the redundant boards by their spare 2. ADS replace by its spare 3. LG replace the present FM by its FS, fully functional Battery pack replace the rechargeable batteries by spare JPB, RSWT, 26-06-02

  3. Battery exchange issue initial added electronics Primaries : 930 Wh Secondaries : 130 Wh JPB, RSWT, 26-06-02

  4. Instrument refurbishments COSAC full replacement of FM by FS 2. APXS replacement of the deployment mechanism, possibly of the alpha sensor head 3. CIVA replacement of harness, and CIVA-M/I 4. CONSERT replace Ebox and antenna PTOLEMY strengthen the piping SESAME repair harness JPB, RSWT, 26-06-02

  5. Instrument exchange summary

  6. Instrument exchange summary

  7. Instrument exchange summary

More Related