An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 802.11af Liaison Report Authors: Date: 2011-11-10 Notice:This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Prabodh Varshney, Nokia

  2. Abstract • Liaison report from 802.11af as presented to 802.19. Prabodh Varshney, Nokia

  3. 802.11af Status before November Meeting • Comment resolution going on… • Group had telcos on Oct 4th, 11th, 18th,25th and Nov. 1st . • Created the LB171 comment spreadsheet in 11-11/277r20. • Created speculative draft D1.04. • Some of the issues being discussed are general spectrum mask representation, extended channel switch with power change, secure enablement and CVS without persistent association, white space map, and interference management. • 18 CIDs on PHY and channelization and 69 MAC comments are without proposed resolutions. • Plan for November meeting: • Complete comment resolution. • Review regulatory landscape. • Begin the process of incorporating the TGac PHY. Prabodh Varshney, Nokia

  4. Current 802.11af Status • Approved comment spreadsheet (277r20) and speculative draft 1.04 as working draft. • Comments resolution approved mainly dealing with following MAC issues: • Channel Power Management • RLQP • Network Channel Control Identifier • WSM • CVS • DSE link identifier element • Device location format • Operating Channel Status • DSE measurement report • CAQ • DSE and enabling • MAC terminology Prabodh Varshney, Nokia

  5. Current 802.11af Status • Discussion in 802.11 mid plenary about which PHY 802.11af should use: 802.11ac or some other. • The 802.11 WG indicated that TGaf would have to wait for TGac to finish their work before it could be adapted by TGaf. • Options: • TGac adaptation, per initial proposal from Ron and Vinko • Return to original direction • New approach to use of TGn with a single bandwidth (no coexistence issues) Prabodh Varshney, Nokia

  6. Current 802.11af Status • Document 1544r0 proposes initial PHY details for TGaf based on TGac with possible enhancements based on TGah: • Envision direct down clocking of 11ac PHY with minimum modifications to accommodate the specific requirements of TGaf. • Proposed BWs: 2 MHz (optional), 4 MHz, 8 MHz. • Group agreed that now the starting point is to use the High throughput PHY with scaling and modifications for the TV bands. • Total number of comments still needs to be resolved 220 (about 160 PHY comments). • Weekly on Tuesdays. Time: 21:00 ET for up to 2 hours Prabodh Varshney, Nokia

  7. Plans for January Meeting • Approve minutes from Atlanta and teleconferences • Approve draft 1.05 and spreadsheet 277r? • Approve proposals from teleconferences • Regulatory update • Complete comment resolutions • Create draft 2.0 • Ask the WG to go to Letter Ballot Prabodh Varshney, Nokia

  8. Official TGaf Timeline (Updated) • Initial Working Group Letter Ballot: January 2011 • Second Working Group Letter Ballot: January 2012 • Recirculation Letter Ballot: May 2012 • Form Sponsor Ballot Pool: October 2012 • Initial Sponsor Ballot: November 2012 • Recirculate Sponsor Ballot: January 2013 • Final WG/EC Approval: July 2013 • RevCom/Standards Board Approval: September 2013 Prabodh Varshney, Nokia