This project amends Schedule 24 to include NAESB Standards, impacting energy efficiency and demand response in North America. Understand the new standards and compliance requirements.
E N D
May 28, 2013 Eric Winkler, Ph.D. Project Manager, Demand Resources Schedule 24 Amendment to Incorporate North American Energy Standards Board Standards for Wholesale Demand Response and Energy Efficiency
Overview • FERC Order No. 676-G adopting NAESB Standard for Wholesale Demand Response (Phase II) and Energy Efficiency (February 21, 2013) • Summary of WEQ 015 and 021 • ISO-NE Compliance with Order • Schedule for stakeholder review of Schedule 24 revision
Order No. 676-G • FERC NOPR RM05-5-020 (April 19, 2012) • Requires ISO/RTOs to revise their OATTs to incorporate by reference the NAESB Phase II Demand Response and Energy Efficiency Measurement and Verification (M&V) Standards • M&V Standards became effective May 6, 2013 • OATT revisions incorporating M&V Standards can be included as part of an unrelated tariff filing • ISO-NE will be incorporating the M&V Standards in Schedule 24 • Revision will be included in filing this summer • No waiver filing required
Summary of Demand Response M&V Standards WEQ-015* Introduction Applicability Overview Performance Evaluation Methodology Definition of Terms (see NAESB WEQ Business Practice Standards WEQ-000, Abbreviations, Acronyms, and Definition of Terms) Provision of Wholesale Electric Demand Response Energy Products Applicability Purpose 015-1.0 General Provision of Wholesale Electric Demand Response Capacity Products Applicability Purpose 015-1.4 General * Standards numbering is confusing 4
Summary of Demand Response M&V WEQ-015 (cont) Provision of Wholesale Electric Demand Response Reserve Products Applicability Purpose015-1.8 General Provision of Wholesale Electric Demand Response Regulation Products Applicability Purpose 015-1.12 General 015-1.16 Maximum Base Load Evaluation 015-1.19 Meter Before / Meter After 015-1.22 Baseline Type-I (Interval Meter) 015-1.25 Baseline Type-II (Non-Interval Meter) 015-1.28 Metering Generator Output 5
Summary of Energy Efficiency M&V WEQ-021 • WEQ-000 Definition of Terms • 021-1 Introduction (which was not incorporated by the Commission) • 021-2 Applicability (which was not incorporated by the Commission) • 021-3 Business Practice Standards • 021-3.1 Energy Efficiency Resource Use Criteria in Wholesale Markets • 021-3.2 General Measurement and Verification Plan Requirements • 021-3.3 Post Installation M&V Report Components* • 021-3.4 Performance Reporting • 021-3.5 M&V Supporting Documents • 021-3.6 M&V Methodologies • 021-3.7 Energy Efficiency Baseline Conditions • 021-3.8 Statistical Significance • 021-3.9 Nominated Energy Efficiency Value Calculations / Demand Reduction Value Calculations • 021-3.10 Measurement and Monitoring • 021-3.11 Measurement Equipment Specification • 021-3.12 Data Validation 6
ISO Compliance With Order • Completed review of compliance with both standards • Revision to Schedule 24 of the OATT as follows: Measurement and Verification of Wholesale Electricity Demand Response (WEQ-015, 2010 Annual Plan Items 4(a) and 4(b), March 21, 2011); and Measurement and Verification of Wholesale Electricity Efficiency (WEQ-021 2010 Annual Plan Item 4(d), July 16, 2012; and excluding 021-1 through 021-1.1; and 021-2 through 021-2.1.3.
Schedule for Stakeholder Review May 28, 2013 TC Meeting – ISO-NE’s initial presentation of revision to Schedule 24 to comply with Order No. 676-G Next TC Meeting – ISO-NE’s second presentation of revision to Schedule 24, and TC action July 2013 PC Meeting – PC action on Schedule 24 revision
Contact Information Eric Winkler, Ph.D. Resource Analysis and Administration ISO New England Email: ewinkler@iso-ne.com