html5-img
1 / 7

Spectrometer Solenoid Update

Spectrometer Solenoid Update. MICE Video Conference #143 September 1, 2011. Steve Virostek - LBNL. Topics. Technical progress - Cold mass opening and mods - Quench resistor assembly - Vacuum vessel modifications - Instrumentation Quench analysis write up

liona
Télécharger la présentation

Spectrometer Solenoid Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spectrometer Solenoid Update MICE Video Conference #143 September 1, 2011 Steve Virostek - LBNL

  2. Topics • Technical progress • - Cold mass opening and mods • - Quench resistor assembly • - Vacuum vessel modifications • - Instrumentation • Quench analysis write up • Radiation shield analyses • Milestones

  3. Technical Progress • Cold mass • - Cover cut open in the area of the quench resistors • - Original resistor assembly to be removed soon • - Diode assembly to remain in place • Quench resistor assembly • - Hardware design and fabrication completed at LBNL • - Preliminary assembly now under way • - Installation to begin next week • Vacuum vessel modifications • - Added penetrations in first vacuum vessel wall complete • - 4th& 5th coolers, larger vacuum ports, prep for end plates • - Modifications to 2nd vacuum vessel under way • Instrumentation • - Calibration of Cernox sensors nearly complete at FNAL • - Silicon diodes and new LHe level gauges received

  4. Parts for Quench Resistor Assembly Resistor cooling test

  5. Quench Analysis Write Up • Spectrometer solenoid quench analyses at LBNL has been completed by Soren Prestemon and Pan Heng • Final write up is currently being reviewed • Several conclusions regarding magnet protection • - Existing passive system provides adequate protection • - Resistor cooling scheme being implemented • - An active, external system will be employed to protect the HTS leads in case of a lead quench

  6. Radiation Shield Analyses Stress and displacement (eddy current forces and shipping loads) Eddy current analysis Thermal analysis

  7. Spectrometer Solenoid Milestones • Resistor/Diode Pack with conduction plate installed to Cold Mass – 14th September • Parts are complete – preparation for installation to start later this week • 2. Cold Mass ready for Helium leak checking – 19th September • Machining work on Vacuum Vessel completed – 22nd September • First unit is now complete, second unit is under way • 4. Cold Mass ready for MLI wrapping – 23rd September • 5. Assembly Starts on Upstream Spectrometer Solenoid – 6th October • 6. Cold Mass and Shield inside the Vacuum Vessel – 25th October