1 / 5

Happenings

Happenings. Chris gave the HSCP Approval talk today Passed – congratulations! Big 2011+12 combo result – 5 analyses! I created a CSC “box” for “Post-LS1 Upgrades” To be led by Alexei Safonov Julie helping clean up the ISR (safety inspection Jan. 31 delayed to mid Feb.)

mandy
Télécharger la présentation

Happenings

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Happenings • Chris gave the HSCP Approval talk today • Passed – congratulations! Big 2011+12 combo result – 5 analyses! • I created a CSC “box” for “Post-LS1 Upgrades” • To be led by Alexei Safonov • Julie helping clean up the ISR • (safety inspection Jan. 31 delayed to mid Feb.) • Her spare board count: • RAT 60, TMB 26 (supposedly additional “bad” boards 22 at CERN, 8 at UCLA). • Need 72 of each. • Send bad TMBs back to UCLA?

  2. Happenings • STEP tests at P5: • Karoly having trouble with CFEB noise test and other CFEB testing, just at Point 5 • Today met with Greg, Evaldas, Misha: • To check delays at B904 using DMB timing/”scope” registers • Then check with real system at P5 on Feb. 11 • Next time system available: May??

  3. Interesting notes • Lots of CMS management changes coming: • Spring-time Spokesperson election (then whole new “cabinet” by summer) • Summertime selection of USCMS leader to replace Joel, Dan Marlow, new Fermilab Director • University programs getting squeezed: • We have our DOE base budget numbers for 2013-2015, they are very tight

  4. Notes from XEB retreat Jan. 25-26 • See https://indico.cern.ch/conferenceDisplay.py?confId=231231 • See my “CSC past, present, and future” talk at https://www.dropbox.com/s/8hqioub6ka416uj/130126_CSC_hauser.pptx • Phase 2 upgrade likely 300M ChF • R&D maybe additional 15-20% of that • Tracker ~120M, large parts of ECAL replaced, etc. • Service work, i.e. making the experiment work: • Do permanent jobs in HEP really go to people who mainly do data analysis, or not? • Not really known, would be interesting to quantify • Spokesperson/deputy encouraged to talk to large groups and those that do not pull their fair share – MOUs?

  5. CRB delivery of 3.30v to TMB • +-5% tolerance means absolute maximum of 3.465v • Data from all Point 5 values by Evaldas: • It looks like nominal setting is 3.35v • Max spread of 0.05 indicates that nominal could be increased to 3.40v • Could be done in conjunction with additional stiffening of the CRB board by clamps, to avoid loosening of the CRBs, if they were designed…

More Related