Create a visible spectrum imaging system with vibration damping for UAV-Airframe B integration. Project involves camera selection, microcontroller design, and vehicle communication interface. Constraints include UAV payload limitations and budget restrictions. Risks identified include vendor issues and camera quality. Team values include punctuality, ethical conduct, and collaboration. Resources for project include labs, machine shop, 3D modeling software, and respective engineering software.
E N D
P09651 – Visible Spectrum Imaging System Lead: Dave Lewis Brian Russell AditiKhare
Project Status • Project Family • R09560 - Open Architecture, Open Source Aerial Imaging Systems • Start Term • 2008-2 • End Term • 2008-3 • Faculty Guide • Dr. Edward Hensel • Primary Customer/Faculty Consultant • Dr. Carl Salvaggio • Other Stakeholders • R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems
Mission Statement • Create a visible spectrum imaging system with vibration damping and a microcontroller that can be mounted on a ground or air based vehicle and interfaced with the given vehicle’s communication systems.
Further Definition • The camera will be a commercial off-the-shelf digital camera with a resolution between 5 and 11 megapixels. • The primary target vehicle for the system is the UAV-Airframe B (project P09232) in accordance with the payload constraints designated by the UAV Aircraft Payload Interface group (project P09235).
VSIS System Concept Payload Interface P09235 Power Unit V DC Interface Electronics RS 232/USB V DC Microcontroller V DC RS 232/USB Mounted to: COTS Camera UAV Airframe B P09232 Memory
Iterations http://www.kodak.com/eknec/PageQuerier.jhtml?pq-locale=en_US&pq-path=11189 http://www.linuxdevices.com/news/NS7074144693.html http://www.active-robots.com/products/accessories/mk-iii/mk3-pbk-250.jpg http://www.freescale.com/webapp/sps/site/prod_summary.jsp?code=M5213EVB&nodeId=0162468rH3YTLC00M95448 http://www.eggertelectronics.com/ssc3info.htm http://www.dpreview.com/news/0207/02070504fujifilmfactory.asp
Staffing Requirements • Project Manager (ME) – Interface with UAV groups, Plan and assign tasks, Resource Allocation, Meet deliverables, Documentation, Camera mounting and platform design. • 1 ME – Camera Selection, Vibration Damping. • 2 CE – Microcontroller design and integration. • 2 EE – Design and integration of interface with vehicle communications, power supply.
Constraints • Limited by size and weight restrictions of UAV payload constraints. • Memory card storage limitations. • Camera’s maximum focal length. • Budget constraints.
Risk Assessment • Change in UAV payload capacity or dimensions. • Vendor issues for Printed Circuit Boards fabrication. • Camera takes poor pictures in motion. • UAV interface failure. • UAV crash with system onboard.
Team Values and Norms • Punctuality • Ethical • Through • Accurate • Communication • Collaboration