1 / 5
Télécharger la présentation
UCSB Module Assembly
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
UCSB Module Assembly Week of 5/23-5/27
Past Week Module assembly on the gantry went smoothly. Checking of HV resistance at the urging of the TEC people showed some slightly high resistances. Out of 190 sensors measured: 5 were between 10 – 25 ohms (2 were on one TEC ST module) 4 were between 5 – 9 ohms 6 were between 2 – 4 ohms 175 were 2 > ohms UCSB Module Assembly Problems
This Week Bonding has kept up with module assembly. 8060 head seems to have taken a turn for the worse although they were able to bond hybrids with it this morning. Proceeding with getting the new head installed ASAP. Wirebonding
More Related