An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC Detector Control System V. Polychronakos, BNL Muon Week, Dec. 2002 - V. Polychronakos

  2. CSC DCS Constraints • High Radiation Environment (up to 20 krad ionizing dose – worst case inner radius, but no safety factor) • Hi risk of SEE  following design considerations: • Few components, radiation qualified • No memories, no configuration registers • No JTAG, I2C, etc • Galvanic isolation of Chambers, no copper connections to chambers other than LV, HV – All signals to/from the chamber transmitted optically • Although certain sensors may be located on the chambers DCS components (ELMB etc) have to be at a larger radius (perimeter of Small Wheel, spokes, or even coexist with EI MDTs?? Muon Week, Dec. 2002 - V. Polychronakos

  3. CSC DCS Requirements Three distinct categories: Category 1. • ASMI/ASMII voltage and current monitoring • Calibration Category 2. • B-field sensors • Radiation levels • Temperature and Atmospheric Pressure (at two points/Endcap) Category 3. • HV/LV control and monitoring • Gas system control and monitoring • Cooling System control and monitoring Muon Week, Dec. 2002 - V. Polychronakos

  4. Implementation Plan • Category 1 – Sensors in Faraday Cage, Use data path to ROD, then DDC link(ethernet) to DCS system • Category 2 – Custom (copy someone’s?) sensor/ELMB • Category 3 – Provided CANbus links (e.g. Wiener PS, etc) Not clear if Gas and Cooling System components will provide similar links, but copy what others in ATLAS invent Establish collaboration with NTU team for implementation of needed Hardware, Software, and overall System Architecture Muon Week, Dec. 2002 - V. Polychronakos