150 likes | 373 Vues
Group 3 Heavy Lift Cargo Plane. William Gerboth, Jonathan Landis, Scott Munro, Harold Pahlck October 8, 2009. Introduction. The team chose to compete in the Regular Class of the SAE Aero East Competition Team must design and build an airplane to lift the most weight
E N D
Group 3Heavy Lift Cargo Plane William Gerboth, Jonathan Landis, Scott Munro, Harold Pahlck October 8, 2009
Introduction • The team chose to compete in the Regular Class of the SAE Aero East Competition • Team must design and build an airplane to lift the most weight • All design and construction must be done by the students without professional help
Objectives • Design and build an airplane to successfully compete in the SAE Aero East Competition • Plane must take off from within a 200 foot runway and then land successfully on a runway of 400 feet • Constraints of 55 total pounds and a height, weight, and length of 200 inches must be followed
Impact • UAVs are becoming more prevalent in the military • Project will provide model for future UAV production • A design maximizing lift will allow for a better performing aircraft
Airfoil Concepts • Optimal Properties: Maximize Lift, Minimize Drag • Researched a variety of airfoil designs • Decided on four concepts based on their high coefficients of lift and low coefficients of drag: • Eppler 423, Selig 1223, NACA 8414, Wortmann FX 63-137 • Obtained values for CL and CD vs. AoA using airfoil modeling software
Airfoil Concepts (cont.) • Airfoils measured in five categories • Each category weighted according to importance • Airfoils rated in all categories • Weighted composite of scores is totaled • Most points = Best airfoil for our needs
Wing Shape Concepts • Three possible wing positions • Straight, Dihedral, Swept • Each shape gives unique control, stability and lift characteristics
Wing Shape Concepts (cont.) • Wing shapes measured in four categories • Metrics – Lift, Ease of Construction, Stability, Proven Success in past competitions • Lift and Stability of primary concern
Landing Gear Concepts • 3 Concepts: Tail Dragger, Tricycle, Retractable • Compared the weight, cost, durability, aerodynamics, ease of takeoff, and ease of landing
Tail Concepts • Four Different arraignments analyzed • T-Tail • Cruciform • H-tail • V-tail • Four categories the tail arraignments are analyzed for are, drag, ease of construction, stability, ground clearance
Deliverables Airplane design Metrics used in concept selections Detailed calculations SOLIDWORKS/ANSYS models Budget for the project Analysis of design
Budget Expected Budget for Plane Total: $3,474
Conclusion Create a competitive airplane design following the rules of the competition Use multiple resources to analyze design Create and follow a clearly defined project management schedule Create an airplane with better capabilities than previous Steven’s designs