1 / 29

W E L C O M E

W E L C O M E. 热烈欢迎尊敬的中国代表团. SOUTHERN REGIONAL LOAD DESPATCH CENTRE Power Grid Corporation of India Limited ( A Government of India Enterprise ). YOU ARE HERE. NORTHERN REGION. NORTH-EASTERN REGION. EASTERN REGION. WESTERNREGION. SOUTHERN REGION. ‘ ELECTRICAL ’ REGIONS. 1.

Télécharger la présentation

W E L C O M E

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. W E L C O M E 热烈欢迎尊敬的中国代表团 SOUTHERN REGIONAL LOAD DESPATCH CENTRE Power Grid Corporation of India Limited (A Government of India Enterprise)

  2. YOU ARE HERE

  3. NORTHERN REGION NORTH-EASTERN REGION EASTERN REGION WESTERNREGION SOUTHERN REGION

  4. ‘ELECTRICAL’ REGIONS 1 NORTHERN REGION NORTH-EASTERN REGION EASTERN REGION 2 WESTERNREGION 3 SAME FREQUENCY FROM PANANDRO IN GUJARAT TO NIRJULI IN ARUNACHAL PRADESH ABOUT 2800 KMS! APART SOUTHERN REGION

  5. YOU ARE HERE

  6. INSTALLED CAPACITY OF SOUTHERN REGION IN MW IPP NUCLEAR WIND HYDRO GAS THERMAL 29508 MW

  7. INTER REGIONAL LINKS TALCHAR CHANDRAPUR ORISSA JEYPORE MAH M.P BALIMELA BARSUR GAZUWAKA RAMAGUNDAM U.SILERU KOLHAPUR L.SILERU A.P BELGAUM T AMBEWADI GOA KAIGA KAR HVDC BIPOLAR STATION HVDCB2B STATION KOLAR MAPS CENTRAL GEN.STATION NEYVELI PONDICHERRY 220 kV LINE T.N 400 kV LINE 500 kV HVDC LINE KER 110 kV HVDC LINE

  8. KARNATAKA ANDHRAPRADESH MAX DEMAND MET MAX DEMAND MET 7441 MW 5445 MW INSTALLED CAPACITY INSTALLED CAPACITY 9067 MW 5041 MW DAILY CONSUMPTION MAX DAILY CONSUMPTION MAX 107 MU 166 MU TAMILNADU KERALA MAX DEMAND MET MAX DEMAND MET 7228 MW 2426 MW INSTALLED CAPACITY INSTALLED CAPACITY 2609 MW 6990 MW DAILY CONSUMPTION MAX DAILY CONSUMPTION MAX 39 MU 146 MU SOUTHERN REGION:QUICK FACTS INSTALLED CAPACITY:29508 MW MAX DEMAND MET:21928 MW MAX CONSUMPTION: 457 MU 3D SOUTHERN REGION DEMAND

  9. TRANSMISSION IN SOUTHERN INDIAIN CKT KMS

  10. SR 400 KV GRID MAP TALCHER 3500 MW TRANSFER CAPABILITY ON HVDC BHADRAVATI JEYPORE 178x2 SIMHADRI NTPC 2x221 8x4 RSTPP GAZUWAKA(AP) 1 301x2 189 15x2 P 187 195 VISAKHAPATNAM (POWERGRID) 267x2 KHAMMAM HYDERABAD 317 P P 115 197x2 P MMDP 155 P VIJAYAWADA 146x2 221x2 258 RAICHUR NAGARJUNASAGAR P Nagjhari 279 172 308 MUNIRABAD SSLMM P KODASAALY 277 52x2 KAIGA 120 GOOTY P N HVDC LINK BETWEEN ER AND SR KURNOOL CUDDAPAH 60 P DAVANAGERE 300 NELLORE 173 302 400 KV LINE PRESENTLY OPERATED AT 220 KV TLGPA HIRIYUR 330 242 NELAMANGALA 28 BANGALORE 98 MADRAS P P HOODY KOLAR HOSUR MAPS 182 181 175 PONDICHERY SALEM 54 P NEYVELI 179 151 164x2 UDUMALPET TRICHY P 130x2 TRICHUR P P 127 130x2 P MADURAI PALLOM KAYANKULAM EDAMON 2x78 THIRUVANATHAPURAM

  11. 765 KV RING MAIN SYSTEM

  12. ULDC SCHEME

  13. Hierarchy of The ULDC Scheme in Southern Region RLDC,Bangalore SCC, Pondy CPCC Hyderabad Kalamassery Chennai Bangalore Andhra Kerala Tamilnadu Karnataka SLDC Hyderabad Kalam’erry Chennai Bangalore Cuddapah Kannur Erode Davangere Warangal Trivandrum Madurai Hubli Vijayawada SUB-LDC

  14. Information Flow to Control Centres Ramagundam Karnataka Warangal Satellite Ghanapur HYDERABAD Vijayawada Andhra Pradesh Hubli Davangeree MW Link Chinkampalli FO Link Bangalore State owneed Link CHENNAI Sub-LDC SLDC Pondy RCLDC Kannur-B Erode UT of Pondy Kerala KALAMASSERY Tamilnadu Madurai Vydyuthi Bhavanam

  15. Southern Region Grid Complexities in Monitoring & Control Integrated Opn of Ten Power Utilities Inter-Regional Energy Transfer ≈5000MU (HVDC) Generators –Hydro, Thermal,Gas/IPP 415 nos. Transmission Network 400/220kV ≈ 37000 Ckm Installed Capacity ≈29508 MW 40,000 POINTS Active Power, Reactive Power, Voltage, Frequency, Transformer Tap Position, Circuit Breaker Position, Isolator Position etc. Transformation Capacity ≈ 45000 MVA Transformers (220kV and above) 476 nos. Dynamic Grid Conditions PROJECT COST:Rs 6840 MILLION(1230 MILLION YUAN) COMPLETED SIX MONTHS AHEAD OF SCHEDULE

  16. COMPLEXITIES • 107,600 ANALOG POINTS • 14100 TELEMETERED ANALOG POINTS • 23500 TELEMETERED STATUS POINTS • 700,000 BYTES TRANSACTED EVERY 10 SECS • 302 RTU STATIONS • 2300 KMS OPTIC FIBRE LINKS • 35 MICROWAVE LINKS • 288 PLCC LINKS

  17. CAPABILITIES • 500,000 ANALOG POINTS • 500,000 STATUS POINTS • MORE THAN 1800 VIDEO TRENDS • CONTINOUS DATABASE RECORDING • REAL TIME NETWORK ANALYSIS EVERY 5 MIN • REAL TIME CONTINGENCY ANALYSIS EVERY 5 MIN • AUTOMATIC TRIGGER OF DISTURBANCE CASES • REDUNDANCY AT COMMUNICATION, HARDWARE AND SOFTWARE LEVELS • DESPATCHER TRAINING SIMULATOR-INTERFACED WITH REAL-TIME SYSTEM

  18. ULDC-THE EYES AND EARS OF THE SYSTEM OPERATOR • ALL CONSTITUENTS GET THE SAME DATA IN REAL TIME. • TRANSPARENCY. • SYNERGY IN OPERATION. • NO “PASSING THE BUCK” APPROACH. • QUANTUM LEAP IN VISIBILITY TO OPERATOR. • INCREASED CONFIDENCE. • FOCUS ON SECURITY AND ECONOMY. • INCREASED SCOPE FOR TRANSACTIONS WITH OTHER REGIONS SOME ULDC PICTURES

  19. ULDC-THE EYES AND EARS OF THE SYSTEM OPERATOR • PREMPTIVE, DYNAMIC “EARLY WARNING” SYSTEMS. • LOAD ANGLE. • ALARMS • CONTINGENCY ANALYSIS • GRID LESS VULNERABLE TO DISTURBANCES. • ANALYSIS OF GRID INCIDENTS – ACCURATE AND EASIER • RESTORATION AFTER PERTURBATION BECOMES MUCH FASTER.

  20. OPGW STRINGING

  21. AVAILABILTY BASED TARIFF

  22. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM

  23. WHAT IS AVAILABILITY TARIFF? • PAYMENT OF FIXED COST αPLANT AVAILABILITY. • VARIABLE COST α SCHEDULED GENERATION • DEVIATIONS ATTRACT A FREQUENCY LINKED CHARGE.(UI-UNSCHEDULED INTERCHANGE)

  24. CURVE ADOPTED FROM 1ST APRIL 2004 A FREQUENCY OF 49.50 HZ CORRESPONDS TO A PRICE OF Rs.4.00 OLD CURVE

  25. Rs.6.00

  26. 谢谢

  27. BACK TO SLIDE

  28. BACK TO SLIDE

  29. BACK TO SLIDE