An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CENTURY PULP AND PAPER LALKUA, NAINITAL ( A BK BIRLA GROUP OF COMPANY ) ISO –9001 – 2000 AND ISO -14001 CERTIFIED COM PANY • AN INTEGERATED PULP & PAPER UNIT • 31320 TPA RAYON GRADE UNIT • 37250 TPA WOOD BASE WRITING PAPER • 84600 TPA BAGASSE BASE PAPER ECO MARKED BAGASSE PAPER

  2. CENTURY PULP AND PAPER POWER ARRANGEMENTS • 6.8 MW TG SET • 21 MW TG SET • 7.5 MVA CONTRACT DEMAND FROM • UPCL 6,10,000 UNITS /DAY

  3. CENTURY PULP AND PAPER THERMAL ENERGY ARRANGEMENTS 23 TPH 46 Kg/cm2FBC C F B 3 NO 25 TPH 46 Kg/cm2 SPREADER STOCKER CFB 1 NO 50 TPH 62 Kg/cm2 FBC C F B 2 NO 40 TPH 46Kg/cm2 CHEM REC BOILER( BHEL ) 1 NO 50 TPH 62Kg/cm2 CHEM REC BOILER( ABL ) 1 NO

  4. ELECTRICAL ENERGY (KWH) : 2001 - 2004

  5. ELECTRICITY CONSUMPTION AND COST • 2001-02 2002-03 2003-04 • PURCHASED • UNITS (Lac kwh/yr) 239.83 192.27 159.73 • COST ( Rs lacs/yr) 1399 1177.84 746.84 • OWN GENERATION • THROUGH DG SETS • UNITS (Lac kwh/yr) 47 34.81 19.37 • COST ( Rs lacs/yr ) 219.44 182.88 117.13 • THROUGH STEAM TURBINES • UNITS ( Lac kwh/yr) 1754.58 1865.88 2001.13 • COST ( Rs lacs/yr) 1937.58 1974.96 1903.86

  6. TOTAL CONSUMPTION OF ELECTRICITY 2001-02 2002-03 2003-04 UNITS (Lac kwh/yr ) 2041.41 2092.96 2180.23 COST (Rs lac/yr) 3556.02 3335.68 2767.83

  7. THERMAL ENERGY CONSUMPTION FOR PROCESS • 2001-02 2002-03 2003-04 • COAL • HEAT VALUE (Mkcal/yr) 728037 653007.6 651336.7 • BLACK LIQUOR • HEAT VALUE 659445 704815 711616.75 • PITH • HEAT VALUE 60501 78867 74641.5 • TOTAL 1447983 1436690 1437595

  8. APPROACH FOR ENERGY CONSERVATION • AWARENESS – EDUCATION & TRAINING • CAPACITY UTILIZATION INCREASED • OPTIMIZATION OF VOLTAGE • OPTIMIZATION OF FREQUENCY • OPTIMIZATION OF OPERATING PROCEDURES • THRUST ON RECYCLE & WASTE MINIMIZATION • FINE TUNING OF PLANTS & EQUIPMENTS • INSTALLATION OF VFD”S • ADOPT ENERGY EFFICIENT LIGHTING • USE OF EFFICIENT EQUIPMENT • TECHNOLOGY UPGRADATION • ASSESSMENT AND MONITORING

  9. ASSESSMENT & MONITORING • AUDIT CONDUCTED BY CII : APRIL2003 • 39 ENERGY SAVING SCHEMES IDENTIFIED • AUDIT CONDUCTED BY INGERSOLL RAND : SEPT 2003 • 8 SCHEMES IDENTIFIED • AUDIT CONDUCTED BY ECKO PUMPS FOR PAPER • M/C III VACUUM SYSTEM : OCT2004 • 4 SCHEMES IDENTIFIED • AUDIT CONDUCTED BY DSCL FOR ENERGY COST • REDUCTION IN FEB 2004 : 4 SCHEMES IDENTIFIED • MOTOR EFFICIENCY ASSESSMENT BY VBI SYSTEMS • PLANT TECHNICAL AUDITS BY INDEPENDENT • COUNSULTANTS : AUG 2004

  10. ORGANISATIONAL SET UP FOR ENERGY CONSERVATION PRESIDENT EC CELL LOSS IDN COM ISO 14001/ ISO 9001/QC TPM * PRODUCTION * TPM SEC * 3 MEMBERS * MR. * POWER HOUSE * PILAARS * CROSS FUNCT * SYSTEM COORD. TEAMS * ELECT&INST * OVERLAPPING * QUALITY CIRC COMMITTEES * ENV & WATER * STO & PUR * PURTA

  11. ENERGY CONSERVATION CELL • FUNCTIONS • COORDINATE STEAM & POWER REQUIREMENTS • STUDY VARIANCE • IDENTIFY ENERGY CONSERVATION OPPURTUNITIES • REVIEW ENERGY AUDIT FINDINGS • STRATEGY • INCREASE AWARENESS • ACHIEVE MAXIMUM PLANT EFFICIENCY • INDUCT LATEST TECHNOLOGY • ENSURE TIME BOUND IMPLEMENTATION

  12. TPM A ZERO BASED APPROACH ENHANCE PLANT EFFICIENCY

  13. ZERO BASED APPROACH LOSS FAILURE DEFECT DOUBT ACCIDENT BREAKDOWN 0

  14. AUTONOMOUS MAINTENANCE( JISHU HOZEN ) MY MACHINE I MAINTAIN

  15. EDUCATION AND TRAINING • SKILL DEVELOPMENT : TRAINING PROGRAMME • TPM AWARENESS 118 • TECHNICAL 722 • BEHAVIORAL 99 • FIRE AND SAFETY 209 • ON JOB TRAINING THROUGH ONE-POINT-LESSON SHEET

  16. TPM RE- DEFINED TOTAL POSITIVE MIND TOTAL POSITIVE MIND TOTAL POSITIVE MIND

  17. LOSS IDENTIFICATION COMMITTEE • HIGHLIGHT PROCESS INEFFICIENCIES • CHECK LOSSES OF ALKALI,FIBRE,WATER, CHEMICAL AND STEAM • ARRANGE CORRECTIVE MEASURES

  18. ISO 9001-2000 • CONTINUAL IMPROVEMENT • WASTE MINIMIZATION • ISO14001 • CONSERVATION OF RESOURSES • ADOPTING CLEANER TECHNOLOGIES • ALTERNATIVE FIBRE RESOURSES • UTILIZATION OF WASTE LIME MUD • UTILIZATION OF WASTE PITH QUALITY CIRCLE • 19 CIRCLES OPERATIVE

  19. ONLY MENTAL ENERGY ANNUAL SAVING IN POWER UTILISATIONWITHOUT INVESTMENT

  20. NO / LOW INVESTMENT SCHEME 2001-02 2002-03 2003-04 NO OF SCHEMES 2 8 9 SAVINGS / ANNUM KWH (LACS) 11.82 8.914 36.755 COAL EQ (TONS) - 16366 32550 Rs ( LACS) 24.65 312.45 658.64 INVESTMENT 2.11 - - TOTAL Rs 995.74

  21. ENERGY CONSERVATION SCHEMES NO / LOW INVESTMENT ( 2001 – 02)

  22. ENERGY CONSERVATION SCHEMES NO / LOW INVESTMENT ( 2002 – 03)

  23. NO / LOW INVESTMENT ( 2002 – 03)

  24. NO / LOW INVESTMENT ( 2002 – 03)

  25. NO / LOW INVESTMENT ( 2003 – 04)

  26. VARIABLE FREQUENCY DRIVES

  27. ENERGY CONSERVATION SCHEMES • VFD2001-02 2002- 03 2003-04 TOTAL NOS INSTALLED 16 11 25 • INVESTMENT 39.3 8.06 31.03 • SAVINGS /ANNUM • KWH (LACS) 21.2 3.66 11.36 • Rs (LACS) 42.4 8.22 22.72 73 . 34 LACS UNIT COST Rs 2.00

  28. VFD - FANS, BLOWERS & PUMPS AFFINITY LAWS Q1 = N1 Q2 N2 2 P1 = N1 P2 N2 3 HP1 = N1 HP2 N2 P2 P mtr of wc P1 Q1 Q2 Q(LPM)

  29. THROTTLING VS SPEED CONTROL

  30. POWER REQUIREMENT VSD VS VALVE THROTTLING • A- damper control = • 0.4 +0.6Q • B -VSD control = Q3 • ASSUMPTIONS : • Static Head on fan/ • pump is negligible. • Fan/pump input is 0.4 • Per Unit under full • valve/ damper • closed condition. 100 A Fan/ Pump Input Power 80 60 40 20 B .2 .4 .6 .8 1.0 Q(LPM) Per unit flow discharge

  31. ENERGY CONSERVATION SCHEMES ELECTRICAL VFD (2001-02)

  32. ELECTRICAL VFD (2002-03)

  33. ELECTRICAL VFD (2003-04)

  34. ELECTRICAL VFD (2003-04)

  35. SLD BAGASSE PAPER M/C

  36. SLD BAGASSE PULP

  37. SLD RGP MCS

  38. SLD WPP CCS ETP TR 3

  39. 132/11 KV 10MVA 11/11KV TG 2 21 MW TG 1 6.8MW BPULP B M/C RGP WPP

  40. HARMONICS STUDY FINDINGS TG1 TG2 DG GR TR 1 GR TR 2 Vthd 1.93 3.80 2.98 0.72 1.78 Ithd 3.52 3.63 3.42 1.17 1.78 PERMITTED VALUES 5 %

  41. OTHER ELECTRICAL SCHEMES FOLLOWED: • PROVISION OF LOAD TRANSFER FROM GRID TO TG WITHOUT INTERRUPTION TO UTILIZE SOURCES • PREVENT IDLE RUNNING OF EQUIPMENTS BY • INTERLOCKING OF PUMPS & AGITATORS • EFFECTIVE CONTROLS LIKE ONE PB FOR COMPLETE GROUP EQUIPMENTS OF PLANT • SWITCH OFF EQUIPMENTS THROUGH TIMERS • DELTA - STAR FOR LIGHTLY LOADED MOTORS • NEUTRAL COMPENSATORS FOR UNBALANCE LOADS • LED”S FOR INDICATING LIGHTS • LOW LOSS HRC FUSES • USE OF ENERGY SAVERS FOR LIGHTING CIRCUITS • USE OF PHOTO CELLS FOR STREET LIGHTS • SPLITTING OF CIRCUITS FOR BETTER CONTROL

  42. TOTAL SAVINGS / ANNUM ( FOR LAST THREE YEARS) KWH (LACS) 4.62 Rs (LACS) 9.24 INVESTMENT Rs (LACS) 9.65

  43. ENERGY CONSERVATION SCHEMES ELECTRICAL OTHERS

  44. ENERGY CONSERVATION SCHEMES ELECTRICAL OTHERS

  45. TOTAL SAVINGS THERMAL / PROCESS 2001-02 2002-03 2003-04 INVESTMENT 77.55 78.90 853.79 SAVINGS KWH (LACS) 29.02 27.69 19.73 COAL EQ.(TONS) 6765.7 5500 3593 Rs (LACS) 235.48 160.58 574.46 970.52 KWH = Rs 2.00 COAL/TON = Rs1800

  46. ENERGY CONSERVATION SCHEMES THERMAL / PROCESS 2001 - 02

  47. THERMAL / PROCESS 2001 – 02 contd…