1 / 9

CLIC RF structure master schedule and CERN production

CLIC RF structure master schedule and CERN production. 10.07.2010. Structure master schedule. Installation started in cw27. Decision to cut a T18. #1, SFO on 23.06.2009 (tank version) #2 LT Ultra disks W27 (sealed version). #1 non conform #2 available. swapped.

Télécharger la présentation

CLIC RF structure master schedule and CERN production

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLIC RF structure master schedule and CERN production 10.07.2010

  2. Structure master schedule Installation started in cw27 Decision to cut a T18 #1, SFO on 23.06.2009 (tank version) #2 LT Ultra disks W27 (sealed version) #1 non conform #2 available swapped Cooling circuits shipped to SLAC Bars at CERN CD10 - Prototype phase (P) for 4 different material (Kugler, LT Ultra) - Full structure in OFE at VDL

  3. Structure master schedule • Fabrication at Kugler: • #1 received in April NC, • #2 required - prototype disk OK • disks at CERN CW28 • Fabrication at VDL: • #1 and #2 disks finished • disks at CERN

  4. Structures in the pipeline Missed slot in ASTA, back to CERN? Stand-by SLAC/KEK technology, KEK copper disks CW31

  5. 2nd unit, preparation in stand-by Contract with KEK signed on 19.06, design started T24 with smaller D and new tuning features Under tendering Compact coupler, asymm. disks Ridged waveguides Mode launcher coupler, symm. disks J. Huopana, disks for brazing test cw28

  6. Mechanical design started Mechanical design not started yet

  7. Radial choke damping Lower DT • Other structures: • x-band speed bump structure • CLIC K structures • 500 GeV structures

  8. T24#1 (tank version) Vacuum baking 4 h at 650 °C Red: changes wrto previous assembly procedure

  9. TD24 #1 RF check  non conform Inspection of all disks (see EDMS report: 10006094 Brazing material inside the disks Launched program to qualify assembly procedure (aim bonding at 1000 C) First results with pure bonding on two samples of 5 disks each seem to be promising

More Related