An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Undulator System Overview Stephen Milton

  2. Undulator Systems WBS 1.4

  3. Undulator Hall Schematic Baseline Layout

  4. LCLS Organization @ L2

  5. Management: Organization APS J.M. Gibson Assoc. Lab. Director LCLS Undulator S. Milton Project Director LCLS Project J. Galayda Project Director D. Walters Vacuum/Diagnostics CAM H.D. Nuhn Undulator System Physicist Accel. Systems. Div. R. Gerig Division Director Exp. Facilities Div. E. Gluskin Division Director M. White Magnet Systems CAM R.Ruland/MMF J. Welch/Fixed Support CAM APS Operations Div. W. Ruzicka Division Director J. Stein Controls CAM

  6. Fully Characterized Prototype

  7. Undulator: Prototype Status • Value Engineered Thoroughly • Most recently • Wingless poles • Aluminum magnet block/pole holder simplification • All measurement tested • Including before and after transporting

  8. 3-D CAD Rendering of the Prototype

  9. Acquisition/Delivery Plan • Undulators • Prototyped and Thoroughly Tested • Long-Lead Procurements • Ti Strongback • Magnet Blocks • Magnets Poles • 1st Article in industry before production run (FY05) • Assemble in industry • Deliver to SLAC MMF • Measure/tune at SLAC • Handover of responsibility to SLAC following successful tuning • Install

  10. Undulator: Status of LLPs • Statement of Work • Complete for Ti stongback • Near complete for the poles and the magnet blocks • Federal Business Opportunities (FedBizOps) • Requests for interest released • Will be used to qualify vendors • See other’s talks for many more details

  11. Continuing Resolution • ??? • For the purpose of this review don’t worry about it.