SAM Production Status. Review of SAMonCAF project needs Status and Statistics on Testing: limitations Documentation Readiness and needs User Feedback Problems and Schedules: Rampup Thoughts. Project needs. http://projects.fnal.gov/samgrid/cdf/cdfdeploy. DCAF.

shika
Télécharger la présentation

SAM Production Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAM Production Status • Review of SAMonCAF project needs • Status and Statistics on Testing: limitations • Documentation Readiness and needs • User Feedback • Problems and Schedules: Rampup Thoughts

  2. Project needs • http://projects.fnal.gov/samgrid/cdf/cdfdeploy

  3. DCAF • Sam_cp_config: Art implementing and distributing • File storage • Alan signs off • Request id: Rick write procedures. • Pinning utilities for datasets. • Done: Alan to sign off – migrate to using sam pin dataset: where the dataset is a sam dataset definition – stefan

  4. CAF • Proof we can run 50 projects all consuming files. Have script, need to run • Proof we can handle/train users to use large datasets • Ran into trouble with >100 procs on 25K files – core dump of pmaster

  5. CAF cont • Ability for users to easily manage failures in their code: sam command imminent • Modifications to the start section as needed for smooth operation, projects should not start until there are slots. • Training of sam shifters on errors and escalation of the importance of sam shifting

  6. Deployment Requirements • 20TB/Day => got to 18, limited by caf slots • Hbot1i=> failed to do entire set (perhaps too much) • Restart station/servers while running (done but there can be situations where projects fail)

  7. Plots and Stats • TB and Files Moved • Loads on DBServer, SAM Station

  8. Station and DBsever

  9. Oracle Server

  10. Plots and Stats:Integrated Files

  11. Integrated Gbytes

  12. Files per Day

  13. Gbytes/day

  14. Limitations • 25KFiles and >100 Projects caused problem • <6K files ok with ? Projects • Ran most of golden dataset through • Running Dcache mounts now • Limits one project (batch slot) to 200G of Dcache (with DH policy of >250M/file, 800Files/project max, batches of 30) • Limit: 200 processes, 50 projects, 8000 files

  15. Documentation • In CAF doc • Want to make a similar one for sam: otherwise Florida pages • Better description of sam commands and how to use. • Have a SAM FastNavigator • http://projects.fnal.gov/samgrid

  16. User Feedback • Matthew Jones: first non-expert • Ability to recover: wants one file out per one in • Able to solve with a for loop and sam giving files • Attracted by idea to save ntuples – also for TOF calibration studies (1G)

  17. Problems and Schedules • Adjust/tune params: no evidence of further need of another station or dbserver machine; have a dedicated process for caf. Want to move to one dbserver for offsite and one for users queries. • File storage bug: fixed • Slow delivery for CondorCAF • Slow delivery offsite (or disk?)

  18. Bugs • Zombie Pmaster (project done, but process still on station node) • 25K file core dump of pmaster

  19. RampUp • Condor-CAF uses resources (one way or another). • Continue job running for the week: after Dcache is back • Can we control 10% of caf. Go to 20% next week. • Sam process type: don’t allow submission unless <8K files. Samtest type?