Project Management and MS Project

Project Management and MS Project. Project Management and MS Project. The project management triangle:. Time. Scope. Resources. Project Management. Define Project Create Project Plan (“Work Plan”) Track and Maintain Project Plan Close Project. Define Project. Project charter:

umika
Télécharger la présentation

Project Management and MS Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Management and MS Project

  2. Project Management and MS Project The project management triangle: Time Scope Resources

  3. Project Management • Define Project • Create Project Plan (“Work Plan”) • Track and Maintain Project Plan • Close Project

  4. Define Project • Project charter: • describes the project’s objectives and rules. • lists norms and ground rules.

  5. Your Project Plan • Identify all the project tasks and who or what will do them (“staffing”). • Get work and time estimates for tasks (person with experience performing the work is the best source). • Determine task dependencies. Which task must finish before which other task starts?, etc. • Enter task and project constraints. Does a certain task have to begin on a certain date?

  6. Estimating a Project Based on Industry Information Planning Analysis Design Implementation Industry Standard For Web 15% 20% 35% 30% Applications Time Required 4 5.33 9.33 8 in Person Months

  7. Track the Project Plan • Compare actual data to original estimates. • Review resource, scope, and schedule factors to balance your priorities. • Identify problems, analyze the spreading of resources, and make midstream changes if necessary.

  8. Close Project (also “Maintenance/Evaluation”) • Interview Users • Correct Bugs • Debrief Project Team • Document Lessons Learned • Close Project

  9. Consequences of Project Risk • Failure to obtain all, or any, of the anticipated benefits • Implementation costs that are higher than expected • Implementation time that is much longer than expected • Technical performance significantly below expectation • Incompatibility of system with hardware and software

  10. Elements of Project Risk • Project Size • Expense • Staffing • Time • Departments • Structure • Tasks • Decisions • Variables • Stability • Experience • Hardware • Software • Operating Sys. • Languages

  11. Project Categories and Degree of Risk Low Structure High Structure Type 5 Low Risk (Susceptible to Mismanagement) Type 1 Low Risk Large Scope Low Relative Technology Type 6 Very Low Risk (Susceptible to Mismanagement) Type 2 Very Low Risk Small Scope Type 7 Very High Risk Type 3 Medium Risk Large Scope High Relative Technology Type 4 Medium - low Risk Type 8 High Risk Small Scope

  12. Tools of Project Management • External Integration • Organizational and other communicative devices that link the project team’s work to users. • Internal Integration • Devices that ensure the project team operates as an integrated unit. • Formal Control Tools • Controls to help evaluate progress and identify discrepancies between actual and planned performance. • Formal Planning Tools • Devices to help structure the sequence of tasks; estimates of financial, time, and technological resources needed.

  13. Influences on Tool Selection Low Structure High Structure Type 5 External Integration - H Internal Integration - M Formal Planning - H Formal Control - H Type 1 External Integration - L Internal Integration - M Formal Planning - H Formal Control - H Large Scope Low Relative Technology Type 6 External Integration - H Internal Integration - L Formal Planning - M Formal Control - H Type 2 External Integration - L Internal Integration - L Formal Planning - M Formal Control - H Small Scope Type 7 External Integration - H Internal Integration - H Formal Planning - L+ Formal Control - L+ Type 3 External Integration - L Internal Integration -H Formal Planning - M Formal Control - M Large Scope High Relative Technology Type 4 External Integration - L Internal Integration - H Formal Planning - L Formal Control - L Type 8 External Integration - H Internal Integration - H Formal Planning - L Formal Control - L Small Scope