1 / 5

ECAL HV adjustment (1)

ECAL HV adjustment (1). Irina Machikhiliyan , 29.08.2012. Input parameters: C1 : coefficients presently used in reconstruction ( coeff_118753_118880, provided by MN) C2 : π ⁰ calibration latest (July, CalibCoefficientsJul2012.txt, provided by Dasha )

vanna
Télécharger la présentation

ECAL HV adjustment (1)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECALHV adjustment (1) Irina Machikhiliyan, 29.08.2012 • Input parameters: • C1:coefficients presently used in reconstruction (coeff_118753_118880, provided by MN) • C2: π⁰ calibration latest (July, CalibCoefficientsJul2012.txt, provided by Dasha) Coefficient for HV correction: C = C1 * C2 To avoid dramatic changes: - if C > 2. then C = 2. - if C < 0.5 then C=0.5

  2. ECAL HV adjustment (2) Irina Machikhiliyan, 29.08.2012 C1 (presently used in reco) C2 (July π⁰ )

  3. ECAL HV adjustment (3) Irina Machikhiliyan, 29.08.2012 C2 (July π⁰ ) C1 (presently used in reco) C1 vs C2 correlation plot

  4. ECAL HV adjustment (4) Irina Machikhiliyan, 29.08.2012 Final correction C = C1*C2 Correction Limit (few cells around beam pipe, which cannot be calibrated correctly anyway)

  5. ECAL HV adjustment (5) Irina Machikhiliyan, 29.08.2012 Ratio HV(new) / HV(old) PmPin(new HV) / PmPin(old HV) New HV settings were tested with LED system: current settings: saveSet for run #126717 new settings: saveSet for run #126718 HV consumption change (no LED, no beam): Old New C 1.0931 A 1.1013 A A 1.0914 A 1.1016 A Not a big change New HV settings are uploaded in ORACLE DB. They can be transferred to HV project recipes (Yuri) as soon as Oliver will reset gain corrections for HLT

More Related