1 / 7

LBT Q4 2007 Engineering Review

LBT Q4 2007 Engineering Review. Primary Mirror Cells. Highlights (Q4/2007). Cells still behaving well Y-axis of SX speed decrease identified and corrected PIC replaced in SX HP-5 4 Actuator failures this Fall ?!?. Open Issues. Technical Cell Documentation deficient and/or nonexistent

xia
Télécharger la présentation

LBT Q4 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q4 2007 Engineering Review Primary Mirror Cells

  2. Highlights (Q4/2007) • Cells still behaving well • Y-axis of SX speed decrease identified and corrected • PIC replaced in SX HP-5 • 4 Actuator failures this Fall ?!? LBT Q4 2007 Engineering Review

  3. Open Issues • Technical • Cell Documentation deficient and/or nonexistent • Hardpoints have lower stiffness that desired, meet 80N/m (min required) • Air boxes hot, require insulation/ventilation • Actuator test stand undocumented/not maintainable • Dew-point of cell compressed air not being monitored • Presence of high concentrations of chlorine through mirror cells point to mirror cleaning solutions as the probable source/cause of corrosion products removed from the cells and air ejector. • Schedule • None • Financial • ETS Test Stand proposal will be cost-plus, >$140k • Resource • Mountain staff limitations pace work at Observatory • ETS staff limitations pace cell documentation effort LBT Q4 2007 Engineering Review

  4. LBT Q4 2007 Engineering Review

  5. LBT Q4 2007 Engineering Review

  6. Progress (Q4/2007) • SX HP-5 PIC replaced • SX oscillation identified and corrected • SX breakaway limits readjusted LBT Q4 2007 Engineering Review

  7. Planning (Q4/2007) • Dew-point monitors will be ordered/installed. • ETS to modify hardpoint monitor board (TBD) • ETS will rework Actuator Calibration Stand (TBD) • Engineering will complete DX characterization measurements 2nd qtr LBT Q4 2007 Engineering Review

More Related