SlideServe
Menu
Préférences
© SlideServe · v2026

Continuous Process Improvement: Deming's PDSA Cycle

yadira avatar
8 diapositives · 213 Views · Jan 02, 2020

Establish a system for ongoing enhancement using Deming's Plan-Do-Check-Act cycle and problem-solving methods. Optimize, control, and adapt processes for effective outcomes and proactive solutions.

Continuous Process Improvement: Deming's PDSA Cycle - slide 1
01 / 8Continuous Process Improvement: Deming's PDSA Cycle
1 / 17

Télécharger la présentation

Continuous Process Improvement: Deming's PDSA Cycle
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Continuous Process Improvement Create a system for constant and continuous improvement

  2. Process Model

  3. Understand the Process: Variations are Major Enemies • Detecting mode (heavy dependence on inspection/testing/control): Fire fighting is not effective • Preventive mode (emphasis on “do it right the first time and all the time): Use FEEDBACK to take corrective actions so that the process can be continuously improved.

  4. Deming’s PDSA Cycle:Embedded in the Continuing System • Plan • Do • Check/Study • Act • Analyze • Plan again • …

  5. Problem Solving: A Continuous Effort • Identify problems as an opportunity • Analyze the problem: to find root causes • Develop optimal and cost effective solutions • Implement changes: system wide • Study the results: worked or not? Need adjustment? • Standardize solution: Keep problems from reoccurring.

  6. Process Improvement Strategy: Finding Cost Effective Solution • Control existing process: i.e., statistical process control (SPC) • Optimize the process: i.e., design of experiment (DOE) • Change the system: hardware, software and brainware • New system: machine, human, materials, method

  7. Six Sigma: Aim High

  8. Continuous Improvement • Build a quality (continuous improvement) culture. Positive and Constructive. • Drive out fear. • Provide organization-structural assurance for continuing feedback system. • Respond to customers needs and solve problems timely. • Standardize the procedure and continuously improve it.