1 / 37

P14414 P3 Arborloo wind resistance test stand

P14414 P3 Arborloo wind resistance test stand. Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman. Overview. Team Introductions Project Statement Customer & Engineering Requirements Functional Decomposition Morphological Chart Benchmarking

yehudi
Télécharger la présentation

P14414 P3 Arborloo wind resistance test stand

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P14414P3 Arborloo wind resistance test stand Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman

  2. Overview • Team Introductions • Project Statement • Customer & Engineering Requirements • Functional Decomposition • Morphological Chart • Benchmarking • Concept Generation & Selection • Risk Analysis • Project Plan • Summary

  3. Team Introductions

  4. Project statement • Create test rig & procedure for scale testing • No current test rig for arborloo • Simulate Type I hurricanes • Measure wind speed, forces • Create test procedure for full size testing • Recommendations for future design of arborloos

  5. Customer Requirements

  6. Engineering requirements

  7. House of quality Most Important Requirements • Safely contain all flying debris that may occur (15.8%) • Measure forces at base/tie downs(11.2%) • Record fluid speed range (11.0%)

  8. Functional Decomposition

  9. Functional Decomposition

  10. Functional Decomposition

  11. Functional Decomposition

  12. Morphological Chart

  13. Morphological chart • Our ideas for the test environment were not feasible and we needed to do in depth concept generation

  14. BenchMarking • Information about wind pressure at various points of "yaw“ • Modeling equations and data that can be modified to apply • Up to 50mph, gives us some data points to compare

  15. Benchmarking

  16. Benchmarking • Important point of "critical wind speed“, speed at which forces overcome the static friction which leads to failure

  17. Process Map

  18. System architecture

  19. Concept Generation: Existing equipment RIT Wind Tunnel Scale Speeds – 1/6 Model • Required Wind Tunnel fluid speed: ~570 mph • Wind tunnel maximum fluid speed: ~120 mph • Using a model that’s one sixth as small, Mimicked wind speed: ~20 mph • ~40 mph for a 1/3 model

  20. Concept Generation: Existing equipment RIT Tow Tank Scale Speeds – 1/6 Model • Required Tow Tank fluid speed: ~40.5 mph • Tow Tank maximum fluid speed: ~2.2 mph • Using a model that’s one sixth as small, Mimicked wind speed: ~5.2 mph • ~10.5 mph for a 1/3 model

  21. Concept Generation: Circular tow tank

  22. Concept Generation: Circular tow tank Max Feasible Simulated Wind Speed: Simulating 95 mph Wind Speed (42.47m/s ): Assuming 10 ft diameter track 1/3 Scale: • Water speed= 8.7 m/s • Drag Force= 11,868 N • Power requirement @ 8.7 m/s=103,251 N*m/s • Horsepower Needed= 138 hp 1/6 Scale: • Water speed= 17 m/s • Drag Force= 11,282 N • Power requirement @ 17 m/s=191,794 N*m/s • Horsepower Needed= 257 hp Maximum of 30 hp engine is feasible within our budget Assuming 10 ft track and 1/3 scale Power=30 hp=22,370 N*m/s Power=156.8*v3 Max Velocity=5.22 m/s ~ 60% of desired speed Max simulated speed= 57 mph

  23. Concept Generation: Water Pumps V: Velocity μ: Viscosity A: Area Re: Reynolds's ρ: Density number L: Length

  24. Concept Generation: Water Pumps Simulating 95mph (42.47m/s) • Reynold’s number of a full size model is approximately 5.5*10^6 • ρ=1.225kg/m^3, V=42.47m/s, L=1.83m, μ=1.73*10^-5Ns/m^2 • Velocity of a model 1/3 the size in water is 8.07m/s • ρ=1000kg/m^3, L=0.61m • , μ=8.94*10^-4Ns/m^2 • Velocity of a model 1/6 the size in water is 16.13m/s • ρ=1000kg/m^3, L=0.305m, μ=8.94*10^-4Ns/m^2 • If a pump has a volumetric flow rate of 50gpm (0.00315m^3/s) • V = 8.07m/s: A = 390mm^2 • V = 16.13m/s: A = 195mm^2 • Areas that need to be covered: • 1/3 model - 186,050mm^2 • 1/6 model – 46513mm^2 • The areas needed to are too small and too many pumps would be needed to cover the area of each model • Number of pumps needed: • 1/3 model – 447 pumps • 1/6 model – 284 pumps

  25. Concept Generation: Water Pumps • 1/3 model: 227 100gpm pumps x $268.04 = $60,845.08 • 1/6 model: 142 100gpm pumps x $268.04 = $38,061.68

  26. Concept Generation: Tow tank hybrid Equations V: Velocity μ: Viscosity A: Area Re: Reynolds's ρ: Density number L: Length : Coeff of Drag

  27. Concept Generation: Tow tank hybrid Simulating 95mph (42.47m/s) • Required power obviously not feasible • If v = 40mph, Vreq = 7.36m/s Fd = 2145N Preq = ~21hp • Maximum testable wind speeds would be around 50mph with a 30hp engine assuming 2m/s lazy river velocity 1/6 Scale • Required velocity of the system to be ~17.5m/s • Drag force would be ~11455.6 N • Required motor would need to be ~250hp 1/3 Scale • Required velocity of the system to be ~8.75 m/s • Drag force would be ~12124N • Required motor would need to be ~140hp

  28. Concept Generation: Tow tank hybrid • 1/3 model: ~140hp → Chrysler ECC 2.0L I4 (150hp) ~$600 Commonly found in Dodge Neons • 1/6 model: ~250hp → Nissan VQ35DE 3.5L V6 (286hp) ~$1500 Commonly found in Infiniti G35 or 350Z • 40mph winds: ~21hp → Small engine (25hp) ~$550

  29. Concept Generation: Piston V: Velocity μ: Viscosity A: Area Re: Reynolds's ρ: Density number L: Length : Coeff of Drag

  30. Concept Generation: Piston Scale Speeds – 1/6th Model • What if we could replicate the aerodynamic force felt by the wind with just pressure? • Main downside is there is no longer an aerodynamic effect • Required Piston Force: ~830 lbs. • Required Piston Pressure: ~12psi • Using a model that’s one sixth as small, Mimicked wind speed: ~95 mph

  31. Concept Selection- 1st iteration

  32. Concept Selection-2nd Iteration

  33. Risk Analysis

  34. Project Plan

  35. Moving Forward • Select scale model testing concept • Expand design for selected concept • Create test plan • Acquire necessary test equipment • Contact area specialists

  36. Summary • Team Introductions • Project Statement • Customer & Engineering Requirements • Functional Decomposition • Morphological Chart • Benchmarking • Concept Generation & Selection • Risk Analysis • Project Plan

  37. Questions?