An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 6 Integer Linear Programming MT 235

  2. Integer Linear Programming • All-Integer Linear Program • All variables must be integers • Mixed-Integer Linear Program • Some, but not all variables must be integers • 0-1 Integer Linear Program • Integer variables must be 0 or 1, also known as binary variables MT 235

  3. Integer Programming – All Integers • Northern Airlines is a small regional airline. Management is now considering expanding the company by buying additional aircraft. One of the main decisions is whether to buy large or small aircraft to use in the expansion. The table below gives data on the large and small aircraft that may be purchased. • As noted in the table, management does not want to buy more than 2 small aircraft, while the number of large aircraft to be purchased is not limited. • How many aircraft of each type should be purchased in order to maximize annual profit? MT 235

  4. Define Variables - Northern Airlines Let: S = # of Small Aircraft L = # of Large Aircraft MT 235

  5. General Form - Northern Airlines Max 1S + 5L s.t. 5S + 50L <= 100 S <= 2 S, L >= 0 & Integer MT 235

  6. Northern Airlines – Graph Solution LP Relaxation (2, 1.8) Budget Small AC MT 235

  7. Northern Airlines – Graph Solution Budget Small AC Rounded Solution (2, 1) MT 235

  8. Northern Airlines – Graph Solution Optimal Solution (0, 2) Budget Small AC MT 235

  9. MT 235

  10. MT 235

  11. MT 235

  12. MT 235

  13. Integer Linear Programming • All-Integer Linear Program • All variables must be integers • Mixed-Integer Linear Program • Some, but not all variables must be integers • 0-1 Integer Linear Program • Integer variables must be 0 or 1, also known as binary variables MT 235

  14. Integer Programming – Mixed Integer • Hart Manufacturing, a mixed integer production problem: • Hart Manufacturing makes three products. Each product goes through three manufacturing departments, A, B, and C. The required production data are given in the table below. (All data are for a monthly production schedule.) MT 235

  15. General Form – Hart Manu. Let: X1= units of product 1 X2= units of product 2 X3= units of product 3 Y1= 1 if production run, else = 0 Y2= 1 if production run, else = 0 Y3= 1 if production run, else = 0 MT 235

  16. General Form – Hart Manu. Max 25X1 + 28X2 + 30X3 – 400Y1 – 550Y2 – 600Y3 s.t. 1.5X1 + 3X2 + 2X3 <= 450 Dept. A 2X1 + X2 + 2.5X3 <= 350 Dept. B .25X + .25X + .25X <= 50 Dept. C X1 <= 175Y1 X2 <= 150Y2 X3 <= 140Y3 Xi >= 0 Yi = integer 0,1 MT 235

  17. MT 235

  18. MT 235

  19. MT 235

  20. MT 235

  21. MT 235

  22. Integer Linear Programming • All-Integer Linear Program • All variables must be integers • Mixed-Integer Linear Program • Some, but not all variables must be integers • 0-1 Integer Linear Program • Integer variables must be 0 or 1, also known as binary variables MT 235

  23. 0-1 Integer Linear Program (Binary Integer Programming) • Assists in selection process • 1 corresponding to undertaking • 0 corresponding to not undertaking MT 235

  24. 0-1 Integer Linear Program (Binary Integer Programming) • Allows for modeling flexibility through: • Multiple choice constraints • k out of n alternatives constraint • Mutually exclusive constraints • Conditional & co-requisite constraint MT 235

  25. Integer Programming - Binary • Integer Programming • CAPEX Inc. is a high technology company that faces some important capital budgeting decisions over the next four years. The company must decide among four opportunities: • 1. Funding of a major R&D project. • 2. Acquisition of an existing company, R&D Inc. • 3. Building a new plant, and • 4. Launching a new product. • CAPEX does not have enough capital to fund all of these projects. The table below gives the net present value of each item together with the schedule of outlays for each over the next four years. All values are in millions of dollars. MT 235

  26. General Form – CAPEX Inc. Let: X1= 1 if R&D Project funded, else = 0 X2= 1 if acquire company, else = 0 X3= 1 if build new plant, else = 0 X4= 1 if launch new project, else = 0 MT 235

  27. General Form – CAPEX Inc Max 100X1 + 50X2 + 30X3 + 50X4 s.t. 10X1 + 30X2 + 5X3 + 10X4 <= 40 Yr 1 15X1 + 0X2 + 5X3 + 10X4 <= 60 Yr 2 15X1 + 0X2 + 5X3 + 10X4 <= 80 Yr 3 20X1 + 0X2 + 5X3 + 10X4 <= 70 Yr 4 Xi = 0,1 MT 235

  28. MT 235

  29. MT 235

  30. MT 235

  31. MT 235

  32. Review Problems • Electrical Utility • Distribution Co. • Alpha Airlines MT 235

  33. Integer Programming - Review • Electrical Utility, a mixed integer set-up problem: • A problem faced by an electrical utility each day is that of deciding which generators to start up in order to minimize total cost. The utility in question has three generators with the characteristics shown in the table below. There are two periods in a day, and the number of megawatts needed in the first period is 2900. The second period requires 3900 megawatts. A generator started in the first period may be used in the second period without incurring an additional startup cost. All major generators (e.g. A, B, and C) are turned off at the end of the day. (Assume all startups occur in time period 1.) MT 235

  34. General Form – Electrical Utility Let: XA1 = Power from Gen A in Period 1 XB1 = Power from Gen B in Period 1 XC1 = Power from Gen C in Period 1 XA2 = Power from Gen A in Period 2 XB2 = Power from Gen B in Period 2 XC2 = Power from Gen C in Period 2 YA = 1 if Generator A started; else = 0 YB = 1 if Generator A started; else = 0 YC = 1 if Generator A started; else = 0 MT 235

  35. General Form – Electrical Utility Min 5(XA1+XA2) + 4(XB1+XB2) + 7(XC1+XC2) + 3000YA + 2000YB + 1000YC s.t. XA1 + XB1 + XC1 >= 2900 XA2 + XB2 + XC2 >= 3900 XA1 <= 2100YA XA2 <= 2100YA XB1 <= 1800YB XB2 <= 1800YB XC1 <= 3000YC XC2 <= 3000YC Xij >= 0 Yi = 0, 1 MT 235

  36. MT 235

  37. MT 235

  38. MT 235

  39. MT 235

  40. MT 235

  41. Integer Programming - Review • Distribution Company, a integer transportation problem: • A distribution company wants to minimize the cost of transporting goods from its warehouses A, B, and C to the retail outlets 1, 2, and 3. The costs (in $’s) for transporting one unit from warehouse to retailer are given in the following table. • The fixed cost of operating a warehouse is $500 for A, $750 for B, and $600 for C, and at least two of them have to be open. The warehouses can be assumed to have adequate storage capacity to store all units demanded, ie., assume each warehouse can store 525 units. MT 235

  42. General Form – Distribution Co. Let: Xij = units shipped from i to j YA = 1 if warehouse A opens, else = 0 YB = 1 if warehouse B opens, else = 0 YC = 1 if warehouse C opens, else = 0 MT 235

  43. General Form – Distribution Co. Min 500YA + 750YB + 600YC + 15XA1 + 32XA2 + 21XA3 + 9XB1 + 7XB2 + 6XB3 + 11XC1 + 18XC2 + 5XC3 s.t. XA1 + XB1 + XC1 = 200 XA2 + XB2 + XC2 = 150 XA3 + XB3 + XC3 = 175 XA1 + XB1 + XC1 <= 525YA XA2 + XB2 + XC2 <= 525YB XA3 + XB3 + XC3 <= 525YC YA + YB + YC >= 2 Xij >= 0 Yi = 0, 1 MT 235

  44. MT 235

  45. MT 235

  46. MT 235

  47. MT 235

  48. Integer Programming - Review • Alpha Airlines, a integer scheduling problem: • Alpha Airlines wishes to schedule no more than one flight out of Chicago to each of the following cities: Columbus, Denver, Los Angeles, and New York. The available departure slots are 8 A.M., 10 A.M., and 12 noon. Alpha leases the airplanes at the cost of $5000 before and including 10 A.M. and $3000 after 10 A.M., and is able to lease at most two per departure slot. Also, if a flight leaves for New York in a time slot, there must be a flight leaving for Los Angeles in the same time slot. The expected profit contribution before rental costs per flight is shown below (in K$) MT 235

  49. General Form – Alpha Airlines Let: Xij= 1 if flight to i occurs in time slot j, else = 0 Yj = number of planes leased for time slot j MT 235

  50. General Form – Alpha Airlines Max 10XC1 + 6XC2 + 6XC3 + 9XD1 + 10XD2 + 9XD3 + 14XL1+ 11XL2 + 10XL3 + 18XN1 + 15XN2 + 10XN3 – 5Y1 – 5Y2 – 3Y3 s.t. XC1 + XC2 + XC3 <= 1 XD1 + XD2 + XD3 <= 1 XL1 + XL2 + XL3 <= 1 XN1 + XN2 + XN3 <= 1 XC1 + XD1 + XL1 + XN1 = Y1 XC2 + XD2 + XL2 + XN2 = Y2 XC3 + XD3 + XL3 + XN3 = Y3 Y1 <= 2 Y2 <= 2 Y3 <= 2 XN1 <= XL1 XN2 <= XL2 XN3 <= XL3 Xij= 0,1 Yj = INTEGER MT 235