Development of 26GHz Dielectric-Based Wakefield Power Extractor *

Development of 26GHz Dielectric-Based Wakefield Power Extractor *. C. Jing, P. Schoessow, A. Kanareykin, Euclid Techlabs, LLC M. Conde, R. Konecny, J. Power, W. Gai, HEP, ANL S. Kazakov, KEK A. Kustov4 , Dynamics Software, Helsinki, Finland. * work is supported by DoE SBIR Phase I funding.

colin
Télécharger la présentation

Development of 26GHz Dielectric-Based Wakefield Power Extractor *

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of 26GHz Dielectric-Based Wakefield Power Extractor* C. Jing, P. Schoessow, A. Kanareykin, Euclid Techlabs, LLC M. Conde, R. Konecny, J. Power, W. Gai, HEP, ANL S. Kazakov, KEK A. Kustov4 , Dynamics Software, Helsinki, Finland * work is supported by DoE SBIR Phase I funding. AAC08, July. 27th---Aug.2nd , 2008

  2. Outline • Motivation • Structure Design • Structure Construction • Planned Experiment • Summary

  3. Motivation • Stable high power RF sources, because of numerous potential applications in a number of areas, have been pursued for decades using different technologies over different frequency bands. C-band dielectric-based wakefield power extractor has been successfully demonstrated recently. Here, using a similar idea, we present a higher frequency rf power extractor to demonstrate a good frequency scalability of this scheme. • Argonne Wakefield Accelerator facility has a unique capability of providing high quality, high charge, and short bunch length beams using their 1.3 GHz photoinjector RF gun. According to their upgrade schedule, within the next three years the facility will be able to generate a 20 MeV bunch train (16 bunches) with up to 50 nC charge per bunch by using a new high QE CsTe cathode and an additional 30 MW klystron. This represents an opportunity for testing high charge related applications like our proposed 26 GHz wakefield RF power extractor.

  4. Structure Design Parameters

  5. Structure Design Est. output *16, 20nC bunch train, steady output power of 148 MW and 56 MV/m peak gradient. The energy loss is 5.7 MeV for the last bunch in the bunch train . *20nC, single bunch, bunch length 1.5mm.

  6. Structure Design Output coupler design

  7. Structure Construction 26GHz Power Extractor: coupler

  8. Structure Construction

  9. Structure Construction Bench test results 26GHz TM01 mode launcher WR34-coaxial adaptor

  10. Planned Experiment Experiment is planned to perform at AWA facility.

  11. Planned Experiment beam simulation by Euclid self-developed code Simulation using the DWA-BD-07 particle code of the longitudinal and transverse wake of a 20nC single drive bunch passing through the power extractor. Snapshots of the electron distributions in the x-z plane traversing the 26GHz decelerator (five bunch train computed using DWA-BD-07). The frames top to bottom show bunches 1-5 at 40ps intervals. The bunches are injected with an initial offset of 0.4mm in the positive x direction. Initial energy of each bunch is 20MeV. Distances in cm; the vertical extent of each plot corresponds to the width of the vacuum channel (±0.35 cm).

  12. Planned Experiment Components developed for beam experiment. WR-34 rf flange 26GHz power detector Heterodyne rf detection circuit 26GHz SiC based rf load is under development.

  13. Summary • We have developed a 26GHz dielectric-based wakefield power extractor. • 148MW, 10ns rf power is expected using AWA to-be-upgraded facility. • 1st experiment is planned early next year.