An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AUSTERVILLE RECTIFICATION PROJECT

  2. PROJECT DETAILS • 1148 OF DWELLINGS TO BE RECTIFIED • BUDGETED AT R 84 000.00 / UNIT • TOTAL BUDGET R 96 million • EXPECTED START DATE: 04 APRIL 2011 • PROPOSED PROJECT DURATION: 18 MONTHS

  3. PROJECT SCOPE • SUPERSTRUCTURE (INTERNAL) • SUPERSTRUCTURE (EXTERNAL) • CIVIL INFRASTRUCTURE

  4. SUPERSTRUCTURE (INTERNAL) • Remove existing defective plaster • Re-plaster walls • Re-paint walls • Remove old in-situ floor coverings in leaving and sleeping areas and replace with ceramic tiles • Replace all old and leaking plumbing works

  5. SUPERSTRUCTURE (INTERNAL)… • Remove all existing widow frame and replace them with aluminum window frames • Remove all door frames and replace them with new timber door frames • Remove all doors and replace them with new doors • Replace all old and defective geysers with new ones

  6. SUPERSTRUCTURE (INTERNAL)… • Remove all existing bathroom furniture and replace with new furniture • Replace all bath tubs with showers • Tile all bathrooms floors and walls with ceramic tiles

  7. SUPERSTRUCTURE (EXTERNAL) • Remove defective old plaster on walls • Re-plaster walls • Install waterproofing band to bottom of walls • Waterproof damp areas • Re-paint walls • Install new door canopies

  8. SUPERSTRUCTURE (EXTERNAL)… • Remove all existing roof structure including the hazardous asbestos roof sheeting and old ceilings • Re-install new roof structure including new • New roof timber trusses • New timber roof anchors • New timber wall plates • New roof under lays • New timber purling • New concrete roof or other

  9. SUPERSTRUCTURE (EXTERNAL)… • Re-install new ceilings • Install new wash-line paved areas • Provide new extra bin areas

  10. CIVIL INFRASTRUCTURE… • SEWER NETWORK • Replace all defective and corroded wall mounted pipes • Replace all defective and corroded fittings including leaking inspection eyes • Inspect and fix all detected leaking manholes

  11. CIVIL INFRASTRUCTURE • WATER SUPPLY • Replace all defective wall mounted pipes • Replace all defective fittings including valves and meters • Inspect and fix all leak- detected buried pipes

  12. CIVIL INFRASTRUCTURE… • STORM WATER • Replace all defective and corroded wall mounted pipes • Replace all defective and corroded gutters • Inspect and clean all blocked down pipes • Replace defective or install new concrete aprons • Install new or repair all defective concrete channels

  13. CIVIL INFRASTRUCTURE… • PLATFORMS • Repair all defective retaining walls • Install retaining walls in places)

  14. TYPICAL RECTIFIED BLOCK VIEWS

  15. COMMUNITY INVOLVEMENT • ESTABLISHMENT OF PROJECT STEERING COMMITTEE (PSC) THROUGH ELECTIONS • ESTABLISHMENT OF LABOUR DESK • ESTABLISHMENT OF BUSINESS DESK • APPOINTMENT OF COMMUNITY LIASION OFFICER / S

  16. JOB CREATION • PRIORITIZE EMPLOYMENT OF LOCAL LABOUR FROM AUSTERVILLE AND SURROUNDING AREAS • UNSKILLED LABOUR • SEMI SKILLED LABOUR • SKILLED LABOUR • REGULAR REPORT ON COMMUNITY RETAINED EARNINGS

  17. BUSINESS OPPORTUNITIES • PRIORITIZE BUSINESS OPPORTUNITIES TO LOCAL SMMEs FOR THE PROCUREMENT OF GOODS AND SERVICES FROM AUSTERVILLE AND SURROUNDING AREAS • MARKET RELATED PRICES

  18. AUSTERVILLE RECTIFICATION PROJECT THANK YOUQ & A