RF Work Plan for Testing Large Amplifier at Daresbury
This project involves testing a large amplifier at Daresbury, conducting electric checks, retesting driver amplifiers, and reporting results by mid-December 2009. Starting in January 2010, a study will begin on MICE hall RF layout, coax systems, component sizes, and construction methods under the hall floor - with a report due after 3 months. If funding allows, CAD visualization of the RF layout will be done. The rebuild and test of the large amplifier will start in April 2010 and last 6 months. In autumn 2010, the first large amplifier system will be disassembled, transported to RAL, installed in MICE hall, and prepared for testing. A report on the RF layout installation will be prepared, along with a design specification if changes are necessary.
Télécharger la présentation 
Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.
F I N
