Spatial Interpolation

Spatial Interpolation. Inverse Distance Weighting The Variogram Kriging Much thanks to Bill Harper for his insights in Practical Geostatistics 2000 and personal conversation. Objectives. In this session we will evaluate a dataset and attempt to:

oshin
Télécharger la présentation

Spatial Interpolation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spatial Interpolation Inverse Distance Weighting The Variogram Kriging Much thanks to Bill Harper for his insights in Practical Geostatistics 2000 and personal conversation

  2. Objectives • In this session we will evaluate a dataset and attempt to: • Explore the theory and implementation of inverse distance weighting • Evaluate issues with IDW interpolation • Explore the theory and implementation of the semi-variogram and it’s applicability to interpolation • Explore the theory and implementation of kriging and it’s applicability to interpolation

  3. Simulated Borehole data (PG 2000) Iron concentration Need to interpolate iron content for unsampled areas General Statistics 47 samples Mean value: 36.3 S.D.: 3.73 Data Set

  4. General Statistics • Histogram shows the relative distribution of the data • Generally follows a normal distribution • Other observations • Minor skew, no big deal

  5. The best unbiased estimate for the standard deviation is 3.726 (see right) Therefore, we are 90% confident that a point drawn at random would be: 30 < T < 42.6 This is based on consulting a students t distribution with 47 samples Data Set

  6. Subset of borehole data Upper left side General Statistics 7 samples Mean value: 40 S.D.: 2.82 Getting somewhat better Subset of Area (northwest area)

  7. The best unbiased estimate for the standard deviation is 3.05 (see right) Therefore, we are 90% confident that a point drawn at random would be: 34.2 < T < 45.7 This is based on consulting a students t distribution with 7 samples Now, the question is, do some of the points exhibit more influence than others? Probably, so lets evaluate the point taking nearness into account

  8. Inverse Distance Weighting • IDW works by using an unbiased weight matrix based on the distances from an unknown value to known values. • Weights may be defined a number of different ways

  9. IDW • ArcGIS provides a nice interface to view points • This example looks at 7 neighbors • Now, lets look at it the “old fashioned way…”

  10. Using 7 neighboring points allows us to interpolate a value based on distances Interpolated value is 39.9 So, our calculation is the same as that in ArcGIS – its just math…. IDW

  11. We will compute it, without considering the autocorrelation in the data: Standard error 2.75 Therefore, we are 90% confident that a point drawn at random would be: 34.7 < T < 45.1 This is based on consulting a students t distribution with 7 samples IDW – standard Error Caveat: we are treating IDW like weighted mean, and the standard deviation like a weighted standard deviation. In reality, you shouldn’t develop confidence intervals for data that is autocorrelated

  12. IDW Methods Power = 2, search = 230 Power = 2, search = 600 So which is best??? Power = 2, search = 150 Power = 4, search = 600

  13. 10 Questions to Evaluate1 • What function of distance should we use? • How do we handle different continuity in different directions? • How many samples should we include in the estimation? • How do we compensate for irregularly spaced or highly clustered sampling? • How far should we go to include samples in our estimation process? • Should we honor the sample values? • How reliable is the estimate when we have it? • Why is our map too smooth? • What happens if our sample data is not Normal? • What happens if there is a strong trend in the values? 1Clark and Harper Practical Geostatistics 2000. Ecosse North America, Llc

  14. Answering the 10 Questions The Variogram

  15. What is a Semi-Variogram 1 • The semi-variogram is a function that relates semi-variance (or dissimilarity) of data points to the distance that separates them. • If we can understand the difference between an unknown quantity and a known quantity, we we can estimate the unknown point d1

  16. Estimating via semi-variogram • Lets assume the relationship between the unknown and known point depends on distance – 121 feet NE/SW • If these two points have the same relationship as the other points, we can look at the other points that are 121 feet NE/SW

  17. Computing the standard differences • For all 31 pairs we can compute the standard deviation • We are assuming a mean of 0, and a normal distribution

  18. Computing the standard differences • The single point we are looking at is 37% Fe. • If our original samples come from a normal distribution, the differences will be normal, so we be 90% confident that a point drawn at random would be:

  19. Taking the semi-variogram further • Chances are, we won’t get to sample our data on a regular grid. • We have to algebraically define some function of distance with the differences in value • Therefore, we will assign h to the distance

  20. N(h) 1 å - + 2 [Z(xi) Z(xi h)] 2N(h) = i 1 Variograms Variogram: g(h) = ½ var [ Z(x) – Z(x+h) ] = ½ E [ {Z(x) – Z(x+h)}2 ] In practice: g(h) = Where: • N(h) is the total number of pairs of observations separated by a distance h. • The fitted curve minimizes the variance of the errors.

  21. Variogram components • Nugget variance: a non-zero value for g when h = 0. Produced by various sources of unexplained error (e.g. measurement error). • Sill: for large values of h the variogram levels out, indicating that there no longer is any correlation between data points. The sill should be equal to the variance of the data set. • Range: is the value of h where the sill occurs (or 95% of the value of the sill). • In general, 30 or more pairs per point are needed to generate a reasonable sample variogram. • The most important part of a variogram is its shape near the origin, as the closest points are given more weight in the interpolation process.

  22. Variogram models Variogram models must be “positive definite” so that the covariance matrix based on it can be inverted (which occurs in the kriging process). Because of this, only certain models can be used.

  23. Semi-variogram models We can enter some numbers in Mathcad and see how the variogram changes.

  24. Effect of lag size on variograms Variogram with a lag size of 5m and a lag tolerance of 2.5m. Variogram with a lag size of 10m and a lag tolerance of 5m.

  25. Anisotropy • There may be higher spatial autocorrelation in one direction than in others, which is called anisotropy: • The figure shows a case of geometric anisotropy, which is incorporated in the variogram model by means of a linear transformation.

  26. Semi-variogram tips • We are assuming a normal distribution • Gives us a picture of the relationship of data values with distance. • If you don’t have a good spatial structure in the semi-variogram, don’t revert to IDW – this is stupid!!!

  27. Comparing Software for Computing the Semi-Variogram Practical Geostatistics 2000 ArcGIS Geostatistical Analyst

  28. Assessing Fit of the Variogram • Cressie Goodness of Fit • For each point used to create the variogram, match how well the model actually fits it

  29. Kriging • Kriging is based on the idea that you can make inferences regarding a random function Z(x), given data points Z(x1), Z(x2), …Z(xn). 3 components: structural (constant mean), random spatially correlated component and residual error. Z(x) = m(x) + g(h) + e”

  30. Kriging • This is our variogram from the borehole data • To discuss the mathematics of kriging, we will look at a simple example of 3 points, and get back to our data in a moment

  31. Kriging Numerical Exampleof Iron Ore Data From Practical Geostatistics 2000

  32. Data Set • Iron Ore Data, based on sample set from PG 2000 • Three point example for simplicity

  33. Calculating Distances • The first thing we do is determine the distances between each point • Also calculate difference in Z values between all points

  34. Semi Variogram • We apply the GLM, based on other test performed on the data • The values chosen give the best Cressie statistics for fit on all data points • Note: Mathcad is not great at creating semivariograms!!!

  35. ComputingWeights • Using basic matrix algebra, we can solve for the weights. • The weights will add to one, due to our eventual “slight of hand” with the last row.

  36. Solving theUnknown • Basic matrix algebra will solve for the unknown value • We also compute the standard error and variance

  37. Solving OurBorehole Data • Start with our original example • Since we have 7 points rather than 3, the screens will be “busier”

  38. Borehole Data • The ability to create semi-variograms in MathCad is pretty bad, but this allows us to visualize the mathematics • Here we are using the spherical model

  39. Borehole Data • Again, we can see with this dataset the weights also add up to one

  40. Solution • Here we’ve computed the value of the unknown point, and the standard error • This was based on the limited set of 7 points, now we’ll do it with the rest.

  41. Predicting the Point • ArcGIS has a good interface for evaluating the weights of the points, in addition to predicting a test location

  42. Kriging Results • ESRI Geostatistical Analyst • Interpolated value • 41.26 • Standard error • 2.16 • PG 2000 • Interpolated value • 41.14 • Standard error • 2.11

  43. Standard Errors • Based on Kriging results, we can assume the “true” value of the unknown point, with 90% confidence as: 37.6 < 41.14 < 44.68 %Fe • So, we are getting better results, better looking maps, and smaller confidence intervals

  44. IDW vs. Kriging Kriging • Kriging appears to give a more “natural” look to the data • Kriging avoids the “bulls eye” effect • Kriging also give us a standard error IDW

  45. Results

  46. Review of 10 Questions to ask1 • What function of distance should we use? • The variogram shows us the spatial structure, and association of the data, and will give us a hint as to what function to possibly use. • How do we handle different continuity in different directions? • Here again, the variogram will tell us whether there is any spatial association, and we can determine which direction by evaluating whether anisotropy exists. • How many samples should we include in the estimation? • Again, we can look at the variogram • How do we compensate for irregularly spaced or highly clustered sampling? • The variogram defines the relationship between points and their distances from other points. Calculating weights in Kriging takes the distances among all points into account. 1Clark and Harper Practical Geostatistics 2000. Ecosse North America, Llc

  47. 10 Questions to ask1 • How far should we go to include samples in our estimation process? • By looking at the variogram we can identify the sill (that area where the spatial correlation has little value). The range tells us the distance where the points are no longer correlated. • Should we honor the sample values? • Still lots of debate on this one. IDW says yes, that’s why we get the bullseye. The nugget effect in Kriging allows us to say no. But, we can set the nugget to zero with Kriging. • How reliable is the estimate when we have it? • Kriging allows us to compute the standard error • Why is our IDW map too smooth? • In IDW when you include points far away they become part of the weights. Since the weights have to add up to one, you are basically taking power away from the closer ones. 1Clark and Harper Practical Geostatistics 2000. Ecosse North America, Llc

  48. 10 Questions to Ask • What happens if our sample data is not Normal? • Basically, make the data normal… • What happens if there is a strong trend in the values? • First, remove the trend, then re-interpolate the points (see ESRI Calif. Ozone example, or Clark and Harper Wolfcamp Data)

  49. Conclusions • It is possible to interpolate an unknown point based on other points in a data set • While it can be done with descriptive statistics, other methods are clearly better • The variogram helps answer many questions related to our data, and provides a wealth of information related to the spatial structure of the data • More robust (geostatistical) methods for interpolation appear to provide better results