MICE Project RF p ower system design review

MICE Project RF p ower system design review. Welcome and Introduction Essential safety information: Fire alarm (bell) – Assembly point is outside over bridge, follow me! Level two alarm (klaxon) – stay in this room and shut windows General safety number: 2222 from any phone

remy
Télécharger la présentation

MICE Project RF p ower system design review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE ProjectRF power system design review • Welcome and Introduction • Essential safety information: • Fire alarm (bell) – Assembly point is outside over bridge, follow me! • Level two alarm (klaxon) – stay in this room and shut windows • General safety number: 2222 from any phone • For the MICE tour, I need your names and employer please – will circulate a list Andy Nichols, STFC, 7-12-11

  2. RF Power system review • Thank you everybody for agreeing to take part • We have a quite ambitious schedule today; we need to keep to time • The aim is to review the RF power system as described to you • We do not have time to re-visit the design in detail today • If any areas do need revision, they will be noted and further meetings arranged if necessary • MICE would like to request the Review Committee to submit a written report of their conclusions

  3. Committee: • Ralph Pasquinelli, FNAL – Chair • Erk Jensen, CERN • Peter Mcintosh, STFC • Kevin Ronald, Strathclyde • Mark Keelan, STFC • Mike Woodward, STFC • Review Charge: • To review the MICE RF power installation and distribution layout in terms of: • Suitability of components, materials and equipment for the MICE application and performance specification so that a major purchase can be confidently made • Specifically address RF control and monitoring and measurement of RF phase, amplitude and frequency • Compatibility and integration of the entire system with its surroundings • Ease with which the system can be assembled and tested • Suitable flexibility to adapt to each of the discrete MICE assembly steps

  4. Previous Reviews: • MICE Technical Board, October 2008, conclusions are posted here: http://mice.iit.edu/tb/ • MICE Technical Board, June 2011, documentation and conclusions are posted here: http://mice.iit.edu/tb/Meetings/2011-06-13/ • This review is the main outcome of the above