SlideServe
Menu
Préférences
© SlideServe · v2026

Team 70: Electric Vehicle

rian avatar
17 diapositives · 314 Views · Jul 18, 2014

Team 70 has embarked on an ambitious electric vehicle project to address rising gas prices and reduce dependency on foreign oil. Our team members include Brock Barras, Josh Day, Matt Griffin, Andrew Phegley, Nathan Smith, and Alex Turek. The project aims to deliver a fully functional electric vehicle featuring a unique drive system powered by Lithium Iron Phosphate batteries, dual 30HP induction motors, and an advanced battery management system. With an estimated project cost of $23,000, we anticipate completion by mid-March, enabling sustainable and efficient transportation solutions.

Team 70: Electric Vehicle - slide 1
01 / 17Team 70: Electric Vehicle
1 / 17

Télécharger la présentation

Team 70: Electric Vehicle
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Team 70: Electric Vehicle

  2. Team 70 Personnel • Team Members • Brock Barras • Josh Day • Matt Griffin • Andrew Phegley • Nathan Smith • Alex Turek • Project Manager: Josh Day • Faculty Advisors • Narayanan Ramachandran (Sai), Power • Haibo Wang, Controls

  3. Outline • Executive Summary: Josh Day • Power System Description: Brock Barras • Control System Description: Matt Griffin • Work Completion Status: Andrew Phegley • Resources: Andrew Phegley • Summary: Nathan Smith

  4. Executive Summary • The Problem? • Rising Gas Prices • Increased Dependency on Foreign Oil • The Solution • Electric Vehicle • So What? • Unique Drive System

  5. Deliverables • Fully Functional Electric Vehicle • Operation Manual

  6. Designation of Responsibility • Power Component Subsystem • Brock Barras • Josh Day • Battery Management Subsystem • Andrew Phegley • Nathan Smith • Control Subsystem • Matt Griffin • Alex Turek • System Integration • Josh Day

  7. Total Project Cost • ~$23,000

  8. Simplified Block Diagram

  9. Power System Description • Powered by Lithium Iron Phosphate Batteries • Dedicated Battery Management System • Dual three phase 30HP induction motors • Driven by Variable Frequency Drives (VFDs) • Energy Recapture System • Recaptures energy lost during hard braking

  10. Control System Description • Programmable Logic Controller • Monitors the following: • Wheel speeds • Throttle pedal position • Steering wheel angle • Vehicle Velocity • Provides the VFDs a run command

  11. Work Completion Status • Completed Work • Purchased Chassis • Repair/Modify Chassis • Acquired Major Electrical Components • VFDs • Motors • PLC • HMI • Began testing VFDs and motors • Plans for Completion

  12. Resources

  13. Summary • Design/Build Electric Vehicle • Independent rear wheel drive • Capable of regenerative braking • Recharge at home • Plan to finish mid-March • Resources Needed • Batteries, Charging components • Battery Management System