siran
Uploaded by
13 SLIDES
812 VUES
170LIKES

Timing Analysis with Waveform Propagation

DESCRIPTION

Timing Analysis with Waveform Propagation. Moon-Su Kim, Sunik Heo , DalHee Lee, DaeJoon Hyun, Byung Su Kim, Bonghyun Lee, Chul Rim, Hyosig Won, Keesup Kim Samsung Electronics Co., Ltd. System LSI Division. ACKNOWLEDGEMENT. Dr. Cho Moon Dr. Peter Kim

1 / 13

Télécharger la présentation

Timing Analysis with Waveform Propagation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Timing Analysis with Waveform Propagation Moon-Su Kim, SunikHeo, DalHee Lee, DaeJoon Hyun, Byung Su Kim, Bonghyun Lee, Chul Rim, Hyosig Won, Keesup Kim Samsung Electronics Co., Ltd. System LSI Division

  2. ACKNOWLEDGEMENT • Dr. Cho Moon • Dr. Peter Kim • PrimeTime Group(Amrita, JW Jang) • SiliconSmart Group(Moninder, JH Song)

  3. Contents • Introduction • Background • Library Characterization Waveform • Waveform Propagation Using Library Noise Model • Experimental Results • Runtime Impact • Conclusion

  4. Introduction • Impact of Scaling • Wire resistance is linearly increased according to process nodes • Long tail due to wire resistance • No significant change in wire capacitance • Device pin cap has relatively larger impact on delay • Accurate analysis of Miller effect between input and output pin is more important <Wire Cap Trend> <Wire Resistance Trend>

  5. Motivation • Conventional timing analysis with non-linear delay model (NLDM) • NLDM cannot consider Miller effect and long tail effect • Timing analysis results can be more optimistic than SPICE results • Composite current source (CCS) model results are similar to NLDM results Drive Strength Strong miller effect Long tail effect

  6. Background • Long tail effect • Slew degradation by wire resistance  long tail • Same input transition(30% ~ 70%)  different propagation delay : long tail effect waveform at driver output Waveform @ next A(real) waveform at end of wire Waveform @Y(real) Waveform @ next A(driver model) Waveform @Y(driver model) Delay difference due to tail of waveform Input output < Slew Degradation due to Wire > < Long Tail Effect>

  7. Background • Miller effect • Impact on current stage delay • Large receivers that are lightly loaded can inject a bump back to the interconnect through the Miller cap (similar to crosstalk) • Receiver acts as an aggressor driver even though there is no external crosstalk source. • Impact on output waveform • Waveform is too distorted to be modeled by any pre-driver accurately • Distortion is instance specific and cannot be modeled by characterization • Representing this complex waveform with delay and slew is not accurate

  8. Library Characterization Waveform • Goal is to drive library cells with waveforms that approximate real waveforms • Need to consider both fast input slew with no RC network effect and slow input slew with significant RC network effect • Can control waveform shape by varying weights of linear ramp vs. exponential component • V_pre-driver = V_linear * ratio + V_exponential *(1-ratio) • Can consider slew degradation at wire by using the lower ratio (more exponential component) • Pre-driver ratio (PDR) of 0.3 means 30% linear and 70% exponential <Pre-driver model>

  9. Vi Miller Cap Timing Model Waveform Propagation • Library noise model is required • Library was characterized using a pre-driver waveform generated from a mixture of linear ramp and exponential waveform • Waveform propagation method • Enable propagation of waveforms for both clock and data networks • CCS-Noise  gate level simulation  accurate waveform propagation & accuracy improvement on the delay and slew Accurate Waveform Propagation + Improved Path Delay & Slew Accuracy = Noise Model +

  10. Waveform Propagation • How well STA consider waveform distortion SPICE Waveform Results Static Timing Analysis Waveform Results

  11. 14 nm Experimental Results • Samsung structural test cases • 415 test cases with 14nm technology • Inverter / Buffer chains with various fanouts, parasitic loading, and driving strengths • Static timing analysis results using library noise model • Waveform propagation analysis is enabled for graph-based analysis (GBA) and path-based analysis (PBA) • Path delay comparison with SPICE Accuracy significantly improved with waveform propagation

  12. Runtime Impact of Waveform Propagation • Comparison was made between two models: • Old but very fast model (NLDM) • New and most accurate model (waveform propagation) • On a real 60 M instance design, waveform propagation was 14% slower than NLDM • Waveform propagation was enabled for both clock and data networks • Runtime increase is tolerable for improved accuracy

  13. Conclusion • Studied waveform distortion due to long tail and miller effect • Libraries were characterized using SiliconSmart • Timing analysis was performed using PrimeTime • SPICE results were obtained using HSPICE • For accurate static timing analysis • Pre-driver waveform with ratio 0.3 (30% linear ramp and 70% exponential) provided the best accuracy for a slow corner library • Accuracy significantly improved with waveform propagation • Runtime degradation by waveform propagation is acceptable(14%)

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer