The need for joint communication in the field Case: The Enschede fireworks disaster Author: Hanno Steenbergen

The need for joint communication in the field Case: The Enschede fireworks disaster Author: Hanno Steenbergen ITO, The Netherlands ( hanno.steenbergen@ito.nl ) Emergency Telecommunications Workshop 26 th – 27 th February 2002, ETSI, Sophia Antipolis, France

Audrey
Télécharger la présentation

The need for joint communication in the field Case: The Enschede fireworks disaster Author: Hanno Steenbergen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The need for joint communication in the field Case: The Enschede fireworks disaster Author: Hanno Steenbergen ITO, The Netherlands (hanno.steenbergen@ito.nl) Emergency Telecommunications Workshop 26th – 27th February 2002, ETSI, Sophia Antipolis, France The author accepts that ETSI makes this submission publicly available on CD-ROM and on the EMTEL web-site.

  2. Contents • Introduction • What went wrong in the communications • Recommendations by the authorities • Conclusions

  3. Introduction • 13 May 2000 in Enschede (NL): SE FIREWORKS explodes • 22 People killed, including 4 firemen • Huge material damage • Questions raised about the action of the emergency services • This presentation: an overview of the findings with relation to the communication in the field based on official reports including that of the “Oosting” committee

  4. What went wrong in the communications (1) • Control room people (general point of contact for emergency services during disasters) were overloaded • Lack of common mobile communication possibilities: everybody tried to contact the control rooms individually • Due to stress situation: control room people inclined to fall back to routine handling / less priority to information exchange with other disciplines • Poor interdisciplinary communication: lack of information and delayed information in the field

  5. What went wrong in the communications (2) • Public telephone systems (fixed and mobile) were overloaded • Staff members unreachable • Military police used paging to call their people: proved to be very useful to them • Insufficient radio discipline • Interrupting a long conversation not possible • Mobile command unit of national police force arrived late • After arrival communications improved significantly, because of experienced people • Difference in jargon hindered inter-disciplinary communications

  6. Recommendations by the authorities • Control rooms centre of information during scaling up • Control rooms of different disciplines must be co-located • Training of control room people must be adapted to emphasize interdisciplinary working • Uniformity in procedures and jargon • Speeding up of roll out of nation wide TETRA network for emergency services (C2000) • Multidisciplinary mobile command units must be installed, strategically spread over the Netherlands • The mobile command unit takes over the lead in communications to the field after deployment

  7. Conclusions (1) • Essential requirements: • Control room oriented mobile communications • Group oriented mobile communications • Interdisciplinary mobile communications • Emergency call • Paging • Mobile command units take over the lead after scaling up • Required increase in capacity for mobile communications achieved via direct mode operation or temporary stand-alone systems

  8. Conclusions (2) • Way of working during disasters must be the same as during daily use • Co-located control rooms • Same technology • During disasters public telephone networks (fixed and mobile) are overloaded: a high availability private mobile system is inevitable

  9. C2000 delivers technology basis • TETRA for voice and data • Proprietary paging system