MuTrig-FEE Status

MuTrig-FEE Status. RIKEN/RBRC Itaru Nakagawa. Install Status. ADTX Boards & ADTX-FEE Cables All Installed Pluming St-2, Oct-7 St-3, Oct-7  3 more chassis to go To be done by today or tomorrow. Station-2 Cross Talk Measurement. Date : 30 Sep 2009 Source : 90Sr

buzz
Télécharger la présentation

MuTrig-FEE Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MuTrig-FEE Status RIKEN/RBRC Itaru Nakagawa

  2. Install Status • ADTX Boards & ADTX-FEE Cables • All Installed • Pluming • St-2, Oct-7 • St-3, Oct-7  3 more chassis to go • To be done by today or tomorrow

  3. Station-2 Cross Talk Measurement Date : 30 Sep 2009 Source : 90Sr Source Position : Radial 90~130cm Azimuthal 20~35cm Probing point : St.2 Oct.6 Gap 3 ATDX Chs.1,2 Oct.5 St.2 20cm 1 2 Strip # 90Sr ・・・ 3 35cm 90cm~130cm Oct.7 Oct.6 (View from St.3)

  4. Terminators

  5. Effect of Terminator • Superposition of cross • talk and Signal from • source (cross talk ~10mV) • No anode wire on • Strip# 1,4 • Terminator reduce • cross talk by ~30% (MAX) Strip# 59

  6. Station-1 Octant-5 Re-Capacitation capacitors 2 anode cards 32 anode wires Terminator Registers

  7. TLD badges to be installed • St-1 beam pipe shielding optimization is onging

  8. MRG & DCMIF installation • South cable install is finished • MRG ID from DCMIF is correct • ADTX send correct data to MRG • check except Oct.7, 8 • ADTX ID check is to be done

  9. October Schedule Noise Hunting, St-1 Recap. RSC 2nd Round Miscabling/performance Checks. American&Japanese Physics Society Joint Meeting 3rd. (Final) Round Miscabling/performance Checks. OASys Camera Alignments St-2&3 Scaffold Disassembly St-1 Scaffold Disassembly